My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 64 EMAIL: RICKM@MUKILTEOWWD.ORG 1 ADDRESS: 7824 MUKILTEO SPEEDWAY 2 MUKILTEO, WA 98275 3 4 PUGET SOUND ENERGY 5 ATTENTION: MARDY PUNTENEY 6 DESK PHONE: 7 CELL PHONE: (425) 754-8053 8 EMAIL: MARDY.PUNTENEY@PSE.COM 9 ADDRESS: 3630 RAILWAY AVE 10 EVERETT, WA 98201 11 12 SNOHOMISH COUNTY PUD #1 13 ATTENTION: BRYAN GREGORY 14 DESK PHONE: (425) 783-4413 15 CELL PHONE: (425) 530-5576 16 EMAIL: BGREGORY@SNOPUD.COM 17 ADDRESS: P.O. BOX 1107 18 EVERETT, WA 98206 19 *** 20 21 1-07.17.OPT2.FR1.DOCX 22 (October 3, 2022) 23 Locations and dimensions shown in the Plans for existing facilities are in accordance with 24 available information obtained without uncovering, measuring, or other verification. 25 26 Public and private utilities, or their Contractors, will furnish all work necessary to adjust, 27 relocate, replace, or construct their facilities unless otherwise provided for in the Plans or 28 these Special Provisions. Such adjustment, relocation, replacement, or construction will 29 be done during the prosecution of the work for this project. It is anticipated that utility 30 adjustment, relocation, replacement, or construction within the project limits will be 31 completed as follows: 32 33 *** The Contractor shall notify and schedule the installation of Snohomish County 34 PUD #1 power lines, Ziply Communications and Comcast communication lines once 35 the Contractor has installed all conduits per this contract and before resurfacing of 36 the roads. The Contractor shall coordinate with the previously mentioned companies 37 to enable the installation of utility vaults and connecting conduits beyond the 38 approach slabs at both ends of the bridge to avoid cutting road restoration to be 39 constructed per these plans. *** 40 41 The Contractor shall attend a mandatory utility preconstruction meeting with the Engineer, 42 all affected subcontractors, and all utility owners and their Contractors prior to beginning 43 onsite work. 44 45 The following addresses and telephone numbers of utility companies or their Contractors 46 that will be adjusting, relocating, replacing or constructing utilities within the project limits 47 are supplied for the Contractor's use: 48 49 *** 50 COMCAST 51 ATTENTION: CASEY BROWN 52
The URL can be used to link to this page
Your browser does not support the video tag.