My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 6/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction 6/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 9:14:55 AM
Creation date
6/4/2024 8:48:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
6/3/2024
Council Approval Date
5/29/2024
Department
Public Works
Department Project Manager
Daniel Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
Federal Aid No. BRM 2776 (009)
Tracking Number
0004373
Total Compensation
$25,409,890.65
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
823
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Edgewater Creek Bridge Replacement November 2023 85 mutually agreed by the parties that when claims or causes of action which the Contractor 1 asserts against the Contracting Agency arising from the Contract are filed with the 2 Contracting Agency or initiated in court, the Contractor shall permit the Contracting Agency 3 to have timely access to all records deemed necessary by the Contracting Agency to assist 4 in evaluating the claims or action. 5 6 1-10.GR1 7 Temporary Traffic Control 8 9 1-10.2.GR1 10 Traffic Control Management 11 12 1-10.2.INST1.GR1 13 Section 1-10.2 is supplemented with the following: 14 15 1-10.2.OPT1.GR1 16 (November 2, 2022) 17 Work Zone Safety Contingency 18 Enhancements to improve the effectiveness of the accepted traffic control plans to 19 increase the safety of the work zones shall be discussed on a weekly basis between the 20 Contractor and the Contracting Agency. Enhancements shall be mutually agreed upon by 21 the Contractor and Engineer prior to performing any Work to implement the enhancement. 22 23 Enhancements do not include the use of Uniformed Police Officers or WSP, address 24 changes to the allowed work hour restrictions, or changes to the staging plans in the 25 Contract (if applicable). If allowed by the Engineer, these items will be addressed in 26 accordance with Section 1-04.4. 27 28 The Contractor shall be solely responsible for submitting any traffic control plan revision 29 to implement the enhancement in accordance with Section 1-10.2(2). 30 31 1-10.2(1).GR1 32 General 33 34 1-10.2(1).INST1.GR1 35 Section 1-10.2(1) is supplemented with the following: 36 37 1-10.2(1).OPT1.GR1 38 (October 3, 2022) 39 The Traffic Control Supervisor shall be certified by one of the following: 40 41 The Northwest Laborers-Employers Training Trust 42 27055 Ohio Ave. 43 Kingston, WA 98346 44 (360) 297-3035 45 https://www.nwlett.edu 46 47 Evergreen Safety Council 48 12545 135th Ave. NE 49 Kirkland, WA 98034-8709 50 1-800-521-0778 51 https://www.esc.org 52
The URL can be used to link to this page
Your browser does not support the video tag.