Laserfiche WebLink
i • <br /> VISSER <br /> ENGINEERING <br /> November 4, 2022 <br /> RECEOVE- <br /> NOV 2 6 2022 , <br /> Manford Chu CITY OF EVERETT <br /> IHB Architects Permit Services <br /> 21620-84th Ave. South <br /> Suite 200 <br /> Kent,WA 98032 <br /> Re: Seattle Bethany Church Everett,WA <br /> Plan Review Response 1 (Plan Check No. B2204-035) <br /> Manford: <br /> The following responses indicate actions that were taken for each item written on the structural <br /> plans by the Everett reviewer James Bronder during the structural plan review of the Seattle <br /> Bethany Church project. Drawings that required revision have been clouded and flagged for easy <br /> identification. <br /> OUTSTANDING ISSUES: <br /> Comment 1. Previous records indicate that the construction of the exterior shell structure and <br /> framing has not received a final building inspection nor a Certificate of Occupancy issued from the <br /> original building permit,B0604-051. Records indicate that the original building has been expired <br /> and sent to archives on July 31,2012. As a result,since no occupancy has been granted,the structure <br /> would be considered an unoccupied structure and is subject to the current building code <br /> requirements as it applies to new construction. Please include additional construction plans and <br /> details outlining that the existing building components comply with the current iteration of the <br /> IBC as it applies to new construction. IBC 106.2.1 <br /> Response: Okay. New structural items will comply with Current Code. The existing items <br /> including the shell structure designed per the original 2003 IBC will not be upgraded to <br /> the current code. Structural items identified in Comment 2 below will be remediated as <br /> recommended. As previously discussed, shell lateral force is controlled by Wind in the <br /> transverse direction (Main Frames at 20'-0"oc) and by Seismic in the longitudinal <br /> direction (Tension Only X-bracing). In comparison to today, Wind Design essentially is <br /> unchanged and may be reduced since Exposure C was utilized in design in-lieu-of <br /> Exposure B. Seismic takes approximately a 3.9%increase in its force level but 1 1/4"rod <br /> has a capacity of 23,400 lbs and actual force of 15,500/(1-.039) = 16,129 lbs (DCR 0.69). <br /> It is assumed that original rod sizing was to satisfy metal building drift. It also appears <br /> that the Metallic Metal Buildings bolted erection received final Special Inspection (OR&A <br /> Report No. 55542 Dated 2/13/07-Exhibit A). Archives are unclear regarding structural <br /> exterior skin framing (OSB sheathing and steel stud framing). Everett Inspection Reports <br /> 1-17-07 clearly indicates in the comments that Inspector Huhta informed the <br /> Superintendent that the Framing Inspection he was to perform that day needed revisions <br /> to the exterior walls to be approved and on site for his inspection -Exhibit B. 3 M weeks <br /> later the same framing inspection was appeared to be approved by Inspector Miller, <br /> framing and shear nailing -Exhibits B& C. No Archive Records were found regarding <br /> the 3 M week interval between framing inspections. 2 % months later the original owner <br /> was sent a letter(Exhibit D) from Everett regarding 4 specific items of concern. Nine <br />