Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 9/7/2022 9/7/2022 BLDG 08-FRAMING KURT KECK NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 9/6/2022 2:15 PM Asfaw Belay <br /> Contact Name:Asfaw Belay <br /> Site Address:5101 BEAUMONT DR <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> 1.Obtain plumbing,mechanical,and electrical permits and rough in inspections.Do not insulate until the above inspections are completed. <br /> 9/7/2022 T-9/7/2022 BLDG 12 FKURT KECK NOT READY eTRAKiT Inspection Request <br /> INSULATION <br /> Notes: <br /> 9/6/2022 2:15 PM Asfaw Belay <br /> Contact Name:Asfaw Belay <br /> Site Address:5101 BEAUMONT DR <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> Do not insulate until mechanical,electrical,plumbing rough in inspections are completed. <br /> 12/23/2022 12/23/2022 BLDG 08-FRAMING BLDG INSPECTOR RESCHEDULE eTRAKiT Inspection Request <br /> ONLINE <br /> Notes: <br /> 12/22/2022 12:47 PM Asfaw Belay <br /> Contact Name:Asfaw Belay <br /> Site Address:5101 BEAUMONT DR <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> 12/27/2022 12/27/2022 BLDG 08-FRAMING BLDG INSPECTOR RESCHEDULE eTRAKiT Inspection Request <br /> ONLINE <br /> Notes: <br /> 12/22/2022 3:07 PM Asfaw Belay <br /> Contact Name:Asfaw Belay <br /> Site Address:5101 BEAUMONT DR <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> 2/27/2023 2/27/2023 BLDG 08-FRAMING KURT KECK CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 2/22/2023 9:36 PM Asfaw Belay <br /> Contact Name:Asfaw Belay <br /> Site Address:5101 BEAUMONT DR <br /> Phone:2063544095 <br /> e-Mail:asfaw08@gmail.com <br /> 1.Need 6'8"headroom at interior stairs2.Add vapor barrier behind untreated lumber in contact with concrete3.Complete air seal at drilled top plates <br /> I <br /> Printed:Tuesday,04 June, 2024 2 of 3 rk <br /> SUPERION <br />