Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 3/17/2021 3/17/2021 PLUMB 03i-ROUGH SHELLIE PONS APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 3/16/20211:21 PM Alex Litovchenko <br /> Contact Name:Alex Litovchenko <br /> Site Address:11329 2ND AVE SE <br /> Phone:4253441875 <br /> e-Mail:masadagroutllc@yahoo.com <br /> (3/17/202111:15 AM SDP) <br /> sdp changed Inspection Type from MECH 04-ROUGH IN to PLUMB 03-ROUGH IN <br /> 7/14/2021 7/14/2021 MECH 06-FINAL TED HUGHES APPRVD-PERMIT see notes <br /> FINAL <br /> Notes: <br /> Contractor is cleaning the site up and he is going to suppprt the condenation drain over to the flower bed after clean up, <br /> Note The material was there on site ready to go. <br /> I <br /> Printed:Tuesday,04 June, 2024 2 of 2 rk <br /> SUPERION <br />