Laserfiche WebLink
EVERETT WAC 296-46B-900: ELECTRICAL PLAN REVIEW <br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required.Then select the box next to(a)to <br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 2964613-900. If plan review is <br /> required, select the box next to(b)and (c)to acknowledge that plan review is required and the electrical plans have been provided <br /> with this permit application. <br /> *If item (a)-(ii, iii,or v) is selected,the work must also comply with section (a)-(vii). See arrow flow chart below. <br /> (3)Electrical plan review. <br /> ❑ (a)Electrical plan review is not required for: <br /> ❑ (i)Low voltage systems; <br /> ❑✓ (ii)Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> O (iii)Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder. <br /> ❑ (iv)Stand-alone utility fed services that do not exceed 250 volts,400 amperes where the project's distribution system <br /> does not include: <br /> (A)Emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (B)An essential electrical system defined in NEC 517.2; or <br /> (C)A required fire pump system. <br /> ✓ (v) Modifications to existing electrical installations where all of the following conditions are met: <br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground; <br /> (B)Does not involve emergency systems other than listed unit equipment per NEC 700.12(F); <br /> (C) Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2; <br /> and <br /> (D)Service or feeder load calculations are increased by 5% or less. <br /> ❑ (vi) Electric power production source(s)such as solar photovoltaic,fuel cell, or wind electric system(s)with a total <br /> rating of 9600 watts or less. <br /> (vii) For installations in (a)(ii),(iii), and (v)of this subsection to be considered,the following must be available <br /> to the electrical inspector before the work is initiated: <br /> (A)A clear and adequate description of the project's scope; <br /> (B)A load calculation(s); <br /> (C)What the load changes are, providing both before and after panel schedules as needed; and <br /> (D)Provide information showing that the service and feeder(s)supplying the panel(s)where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection <br /> for that supply. <br /> NOTE: Electrical plan review is not required for"Medical, dental, and chiropractic clinic"of which is a clinic or <br /> ❑ physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1)(c)(xii). <br /> (b)Electrical plan review is required for all other new or altered electrical projects in educational, institutional, or health care <br /> occupancies defined in this chapter. <br /> (c) If a review is required, the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> Table 900-1 Table 900-2 <br /> Health or Personal Care Facilities Educational and Institutional Facilities,Places of Assembly,or Other Facilities <br /> Health or Personal care Facility Plan Review <br /> Type Required Educational,Institutional,or Plan Review, <br /> - <br /> asc!t=l Other Facility Types Required <br /> o llz rs ui t c•r IC o:e'n Es cCLcat Cna -- <br /> care -t 115t`tUVC^B' Yes <br /> Notes to Tables 900-1 and 900-2. <br /> �' ^acr c host tal - ..�:if'a:.i!'.�r_E•�i�CIC E ectrical I"I.JBCiCI'S <br /> ✓dL5f r.1L'y',^Cf`"1• - Illc?req >'I IE'_'a",0;-ifavi IL`.:tj�CG'IIOL <br /> ,.,rbU Lory SUro IL':' yES Viev.,eo b,.,tqs dc-pa"tire"t. <br /> �=llo ^21'l•;•:la f51S,C I'7:C YES <br /> �e5 oe',�5a1 t'eat-re^t fad <br /> _nf a�_ec ser,l•_efa I Ly E_ E2101 -087 <br /> Ac-1,'es!de-Lia renabi itaLio "es PERMIT# Page 2-Plan Review <br /> -En-ems <br />