My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3219 WAVE DR 2024-06-24
>
Address Records
>
WAVE DR
>
3219
>
3219 WAVE DR 2024-06-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2024 11:20:54 AM
Creation date
6/4/2024 3:41:24 PM
Metadata
Fields
Template:
Address Document
Street Name
WAVE DR
Street Number
3219
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: P2210-026 Description: RELOCATE TOILET, INSTALL A SHOWER VALVE <br /> Applied: 10/19/2022 Approved: 10/19/2022 Site Address: 3219 WAVE DR <br /> Issued: 10/19/2022 Finaled: 6/1/2023 City,State Zip Code: EVERETT,WA 98201 <br /> Status: FINALED Applicant: EFFECTIVE PLUMBING LLC <br /> Parent Permit: B2301-012 Owner:QUEYROUZE CURT THOMAS/TANNER DE LA CRUZ <br /> Parent Project: Contractor: EFFECTIVE PLUMBING LLC <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 10/21/2022 10/21/2022 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> REY 425-772-4245 <br /> effectiveplumbingllc425@gmail.com <br /> -Roll vent for shower above the centerline of the drain per chapter 9 2018 UPC 905.2 Horizontal Drainage Pipe-Replace San tee on its side with a wye <br /> and eighth bend per chapter 7 in the 2018 UPC-Replace union trap for shower with glue trap.Union traps cannot be concealed per 2018 UPC-Fix <br /> extreme grade on shower trap arm per chapter 7 2018 UPC-Install nail plate on 2 by 4"top plate for toilet vent,bottom and top plates for 11/2"shower <br /> vent,and bottom plate for hot and cold lines to shower.-Lower water supply to overhead shower head so that it will be below the attic insulation per <br /> 2018 UPC 312.6 Freezing Protection-Install Mid story support on 11/2"shower vent per chapter 7 2018 UPC <br /> (previously un permitted work)-Roll vent for shower above the centerline of the drain per chapter 9 2018 UPC 905.2 Horizontal Drainage Pipe(408.7.5 <br /> Tests for Shower Receptors-Replace San tee on its side with a wye and eighth bend per chapter 7 in the 2018 UPC-Replace union trap for shower with <br /> glue trap.Union traps cannot be concealed per 2018 UPC-Fix extreme grade on shower trap arm per chapter 7 2018 UPC(New work)-Install nail plate <br /> on 2 by 4"top plate for toilet vent,bottom and top plates for 11/2"shower vent,and bottom plate for hot and cold lines to shower.-Lower water <br /> supply to overhead shower head so that it will be below the attic insulation per 2018 UPC 312.6 Freezing Protection-Install Mid story support on 11/2" <br /> shower vent per chapter 7 2018 UPC <br /> (previously un permitted work)-Roll vent for shower above the centerline of the drain per chapter 9 2018 UPC 905.2 Horizontal Drainage Pipe(408.7.5 <br /> Tests for Shower Receptors-Replace San tee on its side with a wye and eighth bend per chapter 7 in the 2018 UPC-Replace union trap for shower with <br /> glue trap.Union traps cannot be concealed per 2018 UPC-Fix extreme grade on shower trap arm per chapter 7 2018 UPC(New work)-Install nail plate <br /> on 2 by 4"top plate for toilet vent,bottom and top plates for 11/2"shower vent,and bottom plate for hot and cold lines to shower.-Lower water <br /> supply to overhead shower head so that it will be below the attic insulation per 2018 UPC 312.6 Freezing Protection-Install Mid story support on 11/2" <br /> shower vent per chapter 7 2018 UPC <br /> 10/21/2022 10/21/2022 PLUMB 06-SHOWER JASON CORRECTION see notes <br /> PAN MORRISSEY REQUIRED <br /> Notes: <br /> -This is for reminder purposes that a shower pan test will need to be performed on the water proof membrane for the master shower per the UPC, <br /> before mortar and tile can be set.***408.7.5 Tests for Shower ReceptorsShower receptors shall be tested for watertightness by filling with water to the <br /> level of the rough threshold.The test plug shall be so placed that both upper and under sides of the subpan shall be subjected to the test at the point <br /> where it is clamped to the drain. <br /> -This is for reminder purposes that a shower pan test will need to be performed on the water proof membrane for the master shower per the UPC, <br /> before mortar and tile can be set.***408.7.5 Tests for Shower ReceptorsShower receptors shall be tested for watertightness by filling with water to the <br /> level of the rough threshold.The test plug shall be so placed that both upper and under sides of the subpan shall be subjected to the test at the point <br /> where it is clamped to the drain. <br /> -This is for reminder purposes that a shower pan test will need to be performed on the water proof membrane for the master shower per the UPC, <br /> before mortar and tile can be set.***408.7.5 Tests for Shower ReceptorsShower receptors shall be tested for watertightness by filling with water to the <br /> level of the rough threshold.The test plug shall be so placed that both upper and under sides of the subpan shall be subjected to the test at the point <br /> I <br /> Printed:Thursday,01 June,2023 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.