My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Flock Group Inc. 6/7/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
Flock Group Inc. 6/7/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 4:05:24 PM
Creation date
6/7/2024 4:32:01 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Flock Group Inc.
Approval Date
6/7/2024
Council Approval Date
5/29/2024
End Date
6/7/2025
Department
Police
Department Project Manager
Tracey Landy
Subject / Project Title
Flock Safety Community Camera Poject
Tracking Number
0004386
Total Compensation
$225,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Flock Group Inc 2/26/2025 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
How They Will Support YouImplementation Team <br />Field Operations <br />Team <br />The Field Operations team is responsible for the <br />physical installation and maintenance of <br />cameras and associated equipment provided by <br />Flock. This includes a large team of technicians, <br />schedulers, and many others involved in <br />ensuring the delivery of the product. <br />They take the technical plan you finalized with <br />Product Implementation and work closely with <br />other teams at Flock to make sure that the <br />cameras are installed quickly and safely and in <br />a way that maximizes the opportunity to solve <br />crime at a specific location <br />*Note*: For <br />, please always direct them to your <br /> and not the <br />technician. <br />all Installation questions or <br />concerns <br />Customer Success Manager <br />Project Manager <br />Your is your <br />Your project manager will guide you through the <br />entire installation process, keeping you apprised <br />of all implementation updates as well as answering <br />any questions you have during this time. They will <br />ensure that all the cameras are on the ground and <br />operating for at least 48 hours before transitioning <br />you to your Customer Success Manager. <br />Project Manager primary contact <br />during camera installation.<br /> <br />3 <br />Flock Safety Team
The URL can be used to link to this page
Your browser does not support the video tag.