Laserfiche WebLink
Included in scope:<br /> <br />Once designated locations are approved by the customer, as part of the <br /> Flock will perform the following <br />An in-person site survey to confirm the installation feasibility of a location <br />(location assessment, solar assessment, visibility review, etc. <br />Cameras need sufficient power. Since a solar panel is required per camera, <br />it can prevent adequate solar power if two cameras and two solar panels <br />are on a single pole (blocking visibility). Therefore 
 <br />if relying on solar power, only one camera can be installed per pole <br />Confirm that a location is safe for work by following State utility locating <br />procedures. <br />Each installation may include the following <br />Installation of camera and solar panel or AC adapter box  on a suitable <br />existing pole<br /> <br />Existing <br />Infrastructure Implementation Service <br />COST: $150 per camera (one time cost) <br />Existing Infrastructure Implementation <br />Existing <br />Infrastructure Install <br />Pole None Flock NCHRP 350 /  <br />MASH <br />Timeline Short Medium Longest <br />Cost Lowest Mid Highest <br />Standard <br />Install <br />Advanced <br />Install <br />Implementation Service Briefs: Existing <br />Infrastructure vs Standard vs Advanced <br />6