My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Flock Group Inc. 6/7/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
Flock Group Inc. 6/7/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 4:05:24 PM
Creation date
6/7/2024 4:32:01 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Flock Group Inc.
Approval Date
6/7/2024
Council Approval Date
5/29/2024
End Date
6/7/2025
Department
Police
Department Project Manager
Tracey Landy
Subject / Project Title
Flock Safety Community Camera Poject
Tracking Number
0004386
Total Compensation
$225,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Flock Group Inc 2/26/2025 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
7 <br />Out of scope:<br /> <br />By default, Flock does include the following as part of the <br /> but can provide a quote for sourcing at <br />an additional cost <br />Mounting on mast arms (always require bucket truck and traffic control <br />Call 811 ‘Call-before-you-Dig’ syste <br />Installation of any poles including but not limited t <br />Standard, 12’ above grade <br />NCHRP 350 or MASH approved pole (as may be required for locations in <br />DOT right of way <br />A Bucket Truck for accessing horizontal/cross-beams and/or height above 14 <br />Special equipment rentals for site acces <br />Site-specific engineered traffic plan <br />Third-party provided traffic contro <br />State or city-specific specialty contractor licenses or unique attachment/ <br />connection requirement <br />Custom engineered drawings <br />Electrical work requires a licensed electrician. <br />not Existing <br />Infrastructure Implementation Service <br />Flock breakaway pol <br />Types of existing infrastructure such as existing utility, light, and traffic <br />signal poles <br />Pole no higher than 8’-12’ (approval at Flock Safety’s discretion <br />Flock will provide and mount an AC adapter unit that a qualified <br />electrician can connect to AC power following our <br />. Flock is unable to make any AC connections or <br />boreholes in any material other than dirt, grass, loose gravel (or other <br />non-diggable material). Electrical work requiring a licensed electrician <br />and associated costs, not included in the scope <br />Access requiring up to a 14’ using an A-frame ladde <br />Standard MUTCD traffic control procedures performed by a Flock <br />technicia <br />Obtain a business license to operate in the city and state of camera location<br /> <br />electrical wiring <br />requirements
The URL can be used to link to this page
Your browser does not support the video tag.