Laserfiche WebLink
8 <br />Included in scope: <br /> <br />Once designated locations are approved by the customer, as part of the <br />Flock will perform the following <br />An in-person site survey to confirm the installation feasibility of a location <br />(location assessment, solar assessment, visibility review, etc.) <br />Confirm that a location is safe for work by following state utility locating <br />procedures. Work with local utilities to prevent service interruptions <br />during the installatio <br />Engage 811 ‘Call-before-you-Dig’ system to receive legal dig dat <br />Apply approved markings Coordinate with 811 regarding any necessary <br />high-risk dig clearances or required vendor meet <br />Each installation may include the following <br />Installation of camera and solar panel with <br />Standard Implementation Service <br />standard, 12’ above grade <br />Flock breakaway pole<br /> <br />COST: $650 per camera (one time cost) <br />Standard Implementation <br />Flock will provide and mount an AC adapter that a qualified electrician can <br />connect to AC power but cannot make any AC connections or boreholes in <br />any material other than dirt, grass, loose gravel (or other non-diggable <br />material) <br />Concrete cuttin <br />Private utility search for privately owned items not included in standard 811 <br />procedures (communication, networking, sprinklers, etc. <br />Upgrades to power sources to ready them for Flock power (additional fuses, <br />switches, breakers, etc. <br />Any fees or costs associated with filing for required city, county, or state <br />permit <br />Licensing or attachment agreements with asset / infrastructure owners <br />Utility contracts and billing <br />Customer requested relocations (see fee schedule)