Laserfiche WebLink
9 <br />Out of scope: <br /> <br />By default, Flock does include the following as part of the Standard <br />Implementation Service but can provide a quote for sourcing at an additional cost <br />Use and/or mounting to existing infrastructure <br />NCHRP 350 or MASH approved pole (as may be required for locations in DOT <br />right of way <br />A Bucket Truck for accessing horizontal/cross-beams and/or height above 14 <br />Special equipment rentals for site acces <br />Site-specific engineered traffic plan <br />Third-party provided traffic contro <br />State or city-specific specialty contractor license <br />Custom engineered drawings <br />Electrical work requires a licensed electrician. <br />Flock will provide and mount an AC adapter that a qualified electrician can <br />connect to AC power but cannot make any AC connections or boreholes in <br />any material other than dirt, grass, loose gravel (or other non-diggable <br />material) <br />Concrete cuttin <br />Private utility search for privately owned items not included in standard 811 <br />procedures (communication, networking, sprinklers, etc.) <br /> not <br />Installation of camera and AC adapter that a qualified electrician can connect <br />to AC power on a suitable existing pole, no higher than 8-12’ (approval at <br />Flock Safety’s discretion <br />Flock will provide and mount an AC adapter that a qualified electrician can <br />connect to AC power following our . Flock <br />is unable to make any AC connections or boreholes in any material other <br />than dirt, grass, loose gravel (or other non-diggable material). Electrical <br />work requiring a licensed electrician and associated costs, not included in <br />the scope <br />Access requiring up to a 14’ A-frame ladde <br />Standard MUTCD traffic control procedures performed by a Flock technicia <br />Obtain a business license to operate in the City and State of camera location <br />electrical wiring requirements