My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Flock Group Inc. 6/7/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
Flock Group Inc. 6/7/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 4:05:24 PM
Creation date
6/7/2024 4:32:01 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Flock Group Inc.
Approval Date
6/7/2024
Council Approval Date
5/29/2024
End Date
6/7/2025
Department
Police
Department Project Manager
Tracey Landy
Subject / Project Title
Flock Safety Community Camera Poject
Tracking Number
0004386
Total Compensation
$225,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Flock Group Inc 2/26/2025 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
10 <br />Upgrades to power sources to ready them for Flock power (additional fuses, <br />switches, breakers, etc. <br />Any fees or costs associated with filing for required city, county, or state <br />permit <br />Licensing or attachment agreements with asset / infrastructure owners <br />Utility contracts and billing <br />Customer requested relocations (see fee schedule) <br />Included in scope: <br /> <br />Once Designated Locations are confirmed, as part of the <br />, Flock will perform the following <br />An in-person site survey to confirm the installation feasibility of a location <br />(location assessment, solar assessment, visibility review, etc.) <br />Confirm that a location is safe for work by following State utility locating <br />procedures. Work with local utilities to prevent service interruptions during <br />the installatio <br />Engage 811 ‘Call-before-you-Dig’ system to receive legal dig dat <br />Apply approved markings Coordinate with 811 regarding any necessary <br />high-risk dig clearances or required vendor meet <br />Each installation may include the following <br />Installation of camera and solar panel on a suitable <br />approved pole <br />Installation of camera and AC adapter that a qualified electrician can <br />connect to AC power <br />Flock will provide and mount an AC adapter that a qualified electrician <br />can connect to AC power following our . <br />Flock cannot make any AC connections or boreholes in any material <br />other than dirt, grass, loose gravel (or other non-diggable material).<br /> <br />Advanced <br />Implementation Service <br />NCHRP 350 or MASH <br />electrical wiring requirements <br />COST: $1,900 per camera (one time cost) <br />Advanced Implementation
The URL can be used to link to this page
Your browser does not support the video tag.