My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Flock Group Inc. 6/7/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
Flock Group Inc. 6/7/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 4:05:24 PM
Creation date
6/7/2024 4:32:01 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Flock Group Inc.
Approval Date
6/7/2024
Council Approval Date
5/29/2024
End Date
6/7/2025
Department
Police
Department Project Manager
Tracey Landy
Subject / Project Title
Flock Safety Community Camera Poject
Tracking Number
0004386
Total Compensation
$225,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Flock Group Inc 2/26/2025 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
21 <br />After a deployment plan with Designated Locations and equipment has been agreed <br />upon by both Flock and the Customer, any subsequent changes to the deployment <br />plan (“Reinstalls”) driven by a Customer’s request will incur a fee per the table below. <br /> <br />What services incur fees <br />Requested relocations post-approval by customer <br />Relocations due to poor performance will be the responsibility of Floc <br />If a customer requests a location against the advisement of Flock, <br />performance issues and any requested relocations will be the responsibility of <br />the customer <br />Per the contract and absent a defect, in the event that Flock Hardware is lost, <br />stolen, or damaged, Customer may request that Flock replace the Flock <br />Hardware at a fee according to the then-current Reinstall policy <br />Misc billables for out of scope items for each implementation<br /> <br />https://www.flocksafety.com/reinstall-fee-schedule <br />Incurred Fees <br />Camera relocatio <br />Existing infrastructure (non-AC powered)........................................................ <br />Flock pole (non-AC powered).............................................................................. <br />Advanced pole (non-AC powered).................................................................. <br />Replacement <br />Camera only as a result of vandalism, theft, or damage ............................. <br />Pole replacement only as a result of vandalism, theft, or damag <br />Flock pole .......................................................................................................... <br />Advanced pole ............................................................................................... <br />Full replacement as a result of vandalism, theft, or damage <br />Flock pole, camera, and solar (non-AC Powered).................................. <br />Advanced pole, camera, and solar (non-AC Powered)..........................<br /> <br />$350<br /> <br />$750<br /> <br />$5000 <br />$800 <br />$500<br /> <br />$5000 <br />$1300<br /> <br />$5800 <br />*Fee Schedule
The URL can be used to link to this page
Your browser does not support the video tag.