My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders Inc. 6/7/2024 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/7/2024 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2024 4:36:36 PM
Creation date
6/7/2024 4:36:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/7/2024
End Date
9/24/2025
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003791
Total Compensation
$91,328.60
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BNBuilders Inc. 6/14/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />EXHIBIT A <br /> Everett Municipal Building - Public Works Tenant Improvements 5/22/2024 <br />Change Order No. One - Exhibit A <br /> <br />No. Construction Change Directives Amount <br />1 CCD-002 Door Stop Revision to change from floor mounted to wall mounted. Zero cost/time. $ - <br /> <br />2 <br />CCD-006 Womens Restroom Partition Layout - Revised women's restroom partition layout for floors 2-10 to <br />accommodate existing sewer Riser. <br /> <br />$ - <br /> <br />3 <br />RFI-019 Cost for Additional Wall Furring - Per RFI-019 direction, there is additional wall furring in the women's <br />restrooms floors 2-10. <br /> <br />$ 2,831.00 <br />4 CCD-004 Conformed Drawings - Conformed drawing updates and revisions with permit comments incorporated. $ 69,461.95 <br /> <br />5 <br />RFI-025 RR Shaft Wall Replacement - Remove existing metal stud framing & replace with new MSF of South side <br />of restroom shaft-wall. <br /> <br />$ 24,534.00 <br /> <br />No. BN Builders, Inc. Change Proposals Amount <br />1 ASI-001 Layout Revisions - Architectural design layout changes. No cost revision. $ - <br /> <br /> <br />2 <br />Bid-Package 09.29 Cost Allocation Error Reconciliation Alternate credit from awarded low bidder on exterior <br />hoisting option was greater by BNBuilders. The deductive contract change amount reflects making that correction <br />from initial amount that was used. <br /> <br /> <br />$ (13,725.40) <br /> Total: $ 83,101.55 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.