Laserfiche WebLink
<br />EXHIBIT A <br /> Everett Municipal Building - Public Works Tenant Improvements 5/22/2024 <br />Change Order No. One - Exhibit A <br /> <br />No. Construction Change Directives Amount <br />1 CCD-002 Door Stop Revision to change from floor mounted to wall mounted. Zero cost/time. $ - <br /> <br />2 <br />CCD-006 Womens Restroom Partition Layout - Revised women's restroom partition layout for floors 2-10 to <br />accommodate existing sewer Riser. <br /> <br />$ - <br /> <br />3 <br />RFI-019 Cost for Additional Wall Furring - Per RFI-019 direction, there is additional wall furring in the women's <br />restrooms floors 2-10. <br /> <br />$ 2,831.00 <br />4 CCD-004 Conformed Drawings - Conformed drawing updates and revisions with permit comments incorporated. $ 69,461.95 <br /> <br />5 <br />RFI-025 RR Shaft Wall Replacement - Remove existing metal stud framing & replace with new MSF of South side <br />of restroom shaft-wall. <br /> <br />$ 24,534.00 <br /> <br />No. BN Builders, Inc. Change Proposals Amount <br />1 ASI-001 Layout Revisions - Architectural design layout changes. No cost revision. $ - <br /> <br /> <br />2 <br />Bid-Package 09.29 Cost Allocation Error Reconciliation Alternate credit from awarded low bidder on exterior <br />hoisting option was greater by BNBuilders. The deductive contract change amount reflects making that correction <br />from initial amount that was used. <br /> <br /> <br />$ (13,725.40) <br /> Total: $ 83,101.55 <br /> <br /> <br />