My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
d. An electrical contractor license, if required by Chapter 19.28 RCW; <br />e. An elevator contractor license, if required by Chapter 70.87 RCW. <br />4. Not be disqualified from bidding on any public works contract under RCW 39.06.010 or <br />39.12.065(3). <br />5. If bidding on a public works project subject to the apprenticeship utilization requirements in <br />RCW 39.04.320, not have been found out of compliance by the Washington state apprenticeship <br />and training council for working apprentices out of ratio, without appropriate supervision, or <br />outside their approved work processes as outlined in their standards of apprenticeship under <br />chapter 49.04 RCW for the one-year period immediately preceding the date of the bid <br />solicitation; <br />6. Within the three-year period immediately preceding the date of the bid solicitation, not have been <br />determined by a final and binding citation and notice of assessment issued by the department of <br />labor and industries or through a civil judgment entered by a court of limited or general <br />jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of chapter <br />49.46, 49.48, or 49.52 RCW; and <br />7. Have received training on the requirements related to public works and prevailing wage under in <br />accordance with the requirements of RCW 39.04.350(f), or demonstrate exemption from such <br />requirements. <br />The Contract Documents shall apply to Subcontractors and Suppliers as if each had signed the Contract <br />with the Owner. Contractor shall include the provisions of these Contract Documents or a "flow down" <br />clause in each contract with Subcontractors and Suppliers. <br />4.4. RESPONSIBILITIES <br />4.4.1. Subcontractors, Manufacturers and Suppliers <br />The Contractor shall be responsible for the adequacy, efficiency and sufficiency of Subcontractors, <br />manufacturers, Suppliers and their employees. <br />4.4.2. Contractor's Employees <br />The Contractor shall be responsible for the adequacy, efficiency and sufficiency of its employees. <br />Workers shall have sufficient knowledge, skill and experience to perform properly the Work assigned to <br />them. <br />4.4.3. Payment for Labor and Materials <br />The Contractor shall pay and require its Subcontractors to pay any and all accounts for labor including <br />Worker's Compensation premiums, State Unemployment and Federal Social Security payments and other <br />wage and salary deductions required by law. The Contractor also shall pay and cause its Subcontractors <br />to pay any and all accounts for services, Equipment, and materials used by him and its Subcontractors <br />during the performance of Work under this Contract. The Contractor shall pay such accounts as they <br />become due and payable. If requested by the Owner, the Contractor shall promptly furnish proof of <br />payment of such accounts to the Owner. <br />4.4.4. Attention to Work <br />The Contractor, acting through its representative, shall give personal attention to and shall manage the <br />Work so that it shall be prosecuted faithfully and completed under the Project schedule. When its <br />representative is not personally present at the Project Site, its designated alternate shall be available and <br />shall have the authority to act in matters relating to this Contract. <br />4.4.5. Safety <br />The Contractor alone shall be responsible for safety on the job Site, including, but not limited to, the <br />safety of its and its Subcontractor's employees. The Contractor shall maintain the Project Site and <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.