My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2026 2:04:05 PM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction, Inc. 5/31/2026 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
applicable federal regulations or directives issued pursuant thereto. The Contractor shall take <br />such action, including sanctions for noncompliance, with respect to any Subcontractor as the <br />Owner or relevant federal agency may direct so as to enforce such provisions. Provided, <br />however, in the event a Contractor becomes involved in, or is threatened with, litigation with <br />a Subcontractor or Supplier as a result of the foregoing direction, the Contractor may request <br />that the Owner or the United States to enter into such litigation to protect their respective <br />interests. <br />18.8 COMPLETE AGREEMENT <br />These Contract Documents contain the complete and integrated understanding and agreement between the <br />parties and supersedes any understanding, agreement or negotiation, whether oral or written, not set forth <br />herein. <br />18.9 SUCCESSORS BOUND <br />The grants, covenants, provisions and claims, rights, powers, privileges and liabilities contained in the <br />Contract Documents shall be read and held as made by and with, and granted to and imposed upon, the <br />Contractor and the Owner and their respective heirs, executors, administrators, successors and assigns. <br />18.10 EFFECTIVE DATE <br />When duly executed by both the Owner and Contractor, this Contract shall be effective as of the date the <br />Contract (Section 00 52 13) is signed by the Mayor of the City of Everett. There is no contract formed <br />until the Effective Date. <br />18.11 CONTRACTOR REGISTRATION <br />Contractor represents and warrants it is a contractor duly registered and in good standing with the <br />Washington State Department of Labor and Industries. <br />The Remainder of This Page Intentionally Left Blank <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.