My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:19:41 AM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SECTION 00 25 13 <br />PRE -BID MEETING <br />PART 1 <br />1.01 SUMMARY <br />A. One pre -bid meeting will be held to discuss the Project. Attendance at the pre -bid meeting is <br />not mandatory for prospective bidders. At this meeting the items on the Agenda will be <br />covered (see 1.5 AGENDA). The meeting will also include a non -mandatory site visit. <br />1.02 DATES AND TIMES <br />A. A non -mandatory prebid meeting is scheduled at 11:00 AM on Thursday April 18, 2024 at the <br />site with a non -mandatory site visit afterwards_ <br />1.03 LOCATION <br />A. The pre -bid meeting and site visit will occur at the Reservoir 3 site at 6107 Evergreen Way, <br />Everett, WA 98203. <br />1.04 NOT USED <br />1.05 AGENDA <br />A. Review Scope of Project <br />B. Review required documents to be submitted with the Bid Form <br />C. Bid Due Date <br />D. Review Scope of Work <br />E. Review Addendums to date <br />F. Review bid documents, instructions to bidders etc. <br />G. Review Bid Sheet <br />H. Receive questions, comments from bidders <br />1.06 ADDENDA <br />A. Questions received during the pre -bid meeting and site visit shall be noted and answered as <br />addenda. <br />B. All other questions or interpretations must be in writing and received by the City no later than 7 <br />calendar days prior to the bid opening date. <br />END OF SECTION <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 25 13 <br />PRE -BID MEETING March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.