Laserfiche WebLink
ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />EST. QTY <br />UNIT PRICE <br />CONTRACT PRICE <br />1 <br />MOBILIZATION, BONDS, DEMOBILIZATION <br />LS <br />1 <br />$ <br />$ <br />2 <br />SURVEYING AND CONSTRUCTION STAKING <br />LS <br />1 <br />$ <br />$ <br />3 <br />TRENCH AND EXCAVATION SAFETY <br />SYSTEMS <br />LS <br />1 <br />$ <br />$ <br />4 <br />TEMPORARY EROSION AND SEDIMENT <br />CONTROL <br />LS <br />1 <br />$ <br />$ <br />5 <br />EXISTING FIRE TOWER AND DRAFTING PIT <br />DEMOLITION <br />LS <br />1 <br />$ <br />$ <br />6 <br />DEMOLITION <br />LS <br />1 <br />$ <br />$ <br />7 <br />YARD PIPING AND FITTINGS <br />LS <br />1 <br />$ <br />$ <br />8 <br />INLET/OUTLET FLOWMETER VAULT <br />LS <br />1 <br />$ <br />$ <br />9 <br />AWWD PS 2 FLOWMETER STRUCTURE <br />LS <br />1 <br />$ <br />$ <br />10 <br />8 MG PRESTRESSED CONCRETE TANKS <br />(AWWA D110, TYPE I) & ACCESSORIES <br />LS <br />1 <br />$ <br />$ <br />11 <br />ZONE A ONSITE SPOILS STOCKPILING <br />CY <br />45,000 <br />$ <br />$ <br />12 <br />ZONE A OVER -EXCAVATION <br />CY <br />1,000 <br />$ <br />$ <br />13 <br />OVER -EXCAVATION <br />CY <br />100 <br />$ <br />$ <br />14 <br />FINAL GRADING AND SITE WORK <br />LS <br />1 <br />$ <br />$ <br />15 <br />UNDERDRAIN SUMP PUMP <br />LS <br />1 <br />$ <br />$ <br />16 <br />STORMWATER IMPROVEMENTS <br />LS <br />1 <br />$ <br />$ <br />17 <br />STORMWATER DETENTION VAULTS <br />EA <br />2 <br />$ <br />$ <br />18 <br />ELECTRICAL AND INSTRUMENTATION <br />LS <br />1 <br />$ <br />$ <br />19 <br />AWWD PIPE SUPPORT <br />LS <br />1 <br />$ <br />$ <br />20 <br />CHARLES AND TULALIP CUT/CAPS <br />EA <br />6 <br />$ <br />$ <br />21 <br />LAUREN VALVE CONNECTION <br />LS <br />1 <br />$ <br />$ <br />22 <br />FEDERAL AVENUE CONNECTION <br />LS <br />1 <br />$ <br />$ <br />23 <br />TESTING, STARTUP, AND O&M MANUAL <br />LS <br />1 <br />$ <br />$ <br />24 <br />RECORD DRAWINGS <br />LS <br />1 <br />$ <br />$ <br />25 <br />FORCE ACCOUNT <br />FA <br />1 <br />$ 200,000 <br />$ <br />SUB -TOTAL <br />$ <br />SALES TAX (9.9%) <br />$ <br />TOTAL BID <br />$ <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 <br />BID FORM <br />00 41 13 <br />March 2024 <br />