Laserfiche WebLink
SECTION 00 43 36 <br />PROPOSED SUBCONTRACTORS FORM <br />1. For heating, ventilation and air conditioning, plumbing (as defined by RCW Chap. 18.106) <br />and electrical work (as defined by RCW Chap. 19.28), and structural steel installation and rebar <br />installation, Bidder MUST either identify itself or Subcontractors in the table below. If Bidder <br />believes such work is not part of the Work, Bidder shall write "NO WORK". <br />2. Bidder shall not list more than one Subcontractor for each category of Work identified, unless <br />Subcontractors vary with Bid alternates, in which case the Bidder must indicate which <br />Subcontractor will be used for which alternate. <br />3. Bidder's Bid shall be deemed non -responsive and void if: <br />A. For heating, ventilation and air conditioning, plumbing, electrical work, structural steel <br />installation and rebar installation, Bidder fails: (1) to submit as part of the Bid the names of <br />such Subcontractors; (2) to name itself to perform such Work; or (3) to write "No Work"; or <br />B. Bidder names two or more Subcontractors to perform the same Work. <br />4. The requirement to name the Bidder's proposed heating, ventilation, air conditioning, <br />plumbing, electrical, structural steel installation and rebar installation subcontractors applies <br />only to proposed heating, ventilation, air conditioning, plumbing, electrical, structural steel <br />installation and rebar installation subcontractors who will contract directly with the general <br />contractor submitting the Bid to the City. <br />5. The heating, ventilation and air conditioning, plumbing, and electrical portions of the chart <br />below must be submitted with the bid proposal or within one hour of the published bid submittal <br />time. <br />6. The structural steel installation and rebar installation portions of the chart below must be <br />submitted with the bid proposal or within forty-eight hours of the published bid submittal time. <br />Type/Scope of Work <br />Name and Address of Subcontractor or Bidder <br />HEATING <br />Subcontractor, bidder or "no work" MUST be <br />stated <br />VENTILATION AND AIR CONDITIONING <br />Subcontractor, bidder or "no work" MUST be <br />stated <br />PLUMBING (as described in RCW Chap. 18.106) <br />Subcontractor, bidder or "no work" MUST be <br />stated <br />ELECTRICAL (as described in RCW Chap. 19.28) <br />Subcontractor, bidder or "no work" MUST be <br />stated <br />STRUCTURAL STEEL INSTALLATION <br />Subcontractor, bidder or "no work" MUST be <br />stated <br />REBAR INSTALLATION <br />Subcontractor, bidder or "no work" MUST be <br />stated <br />END OF SECTION <br />Reservoir 3 Replacement Phase 1 SUBCONTRACTORS FORM <br />Work Order No. UP3739 <br />00 43 36 <br />March 2024 <br />