My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:19:41 AM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SECTION 00 43 36 <br />PROPOSED SUBCONTRACTORS FORM <br />1. For heating, ventilation and air conditioning, plumbing (as defined by RCW Chap. 18.106) <br />and electrical work (as defined by RCW Chap. 19.28), and structural steel installation and rebar <br />installation, Bidder MUST either identify itself or Subcontractors in the table below. If Bidder <br />believes such work is not part of the Work, Bidder shall write "NO WORK". <br />2. Bidder shall not list more than one Subcontractor for each category of Work identified, unless <br />Subcontractors vary with Bid alternates, in which case the Bidder must indicate which <br />Subcontractor will be used for which alternate. <br />3. Bidder's Bid shall be deemed non -responsive and void if: <br />A. For heating, ventilation and air conditioning, plumbing, electrical work, structural steel <br />installation and rebar installation, Bidder fails: (1) to submit as part of the Bid the names of <br />such Subcontractors; (2) to name itself to perform such Work; or (3) to write "No Work"; or <br />B. Bidder names two or more Subcontractors to perform the same Work. <br />4. The requirement to name the Bidder's proposed heating, ventilation, air conditioning, <br />plumbing, electrical, structural steel installation and rebar installation subcontractors applies <br />only to proposed heating, ventilation, air conditioning, plumbing, electrical, structural steel <br />installation and rebar installation subcontractors who will contract directly with the general <br />contractor submitting the Bid to the City. <br />5. The heating, ventilation and air conditioning, plumbing, and electrical portions of the chart <br />below must be submitted with the bid proposal or within one hour of the published bid submittal <br />time. <br />6. The structural steel installation and rebar installation portions of the chart below must be <br />submitted with the bid proposal or within forty-eight hours of the published bid submittal time. <br />Type/Scope of Work <br />Name and Address of Subcontractor or Bidder <br />HEATING <br />Subcontractor, bidder or "no work" MUST be <br />stated <br />VENTILATION AND AIR CONDITIONING <br />Subcontractor, bidder or "no work" MUST be <br />stated <br />PLUMBING (as described in RCW Chap. 18.106) <br />Subcontractor, bidder or "no work" MUST be <br />stated <br />ELECTRICAL (as described in RCW Chap. 19.28) <br />Subcontractor, bidder or "no work" MUST be <br />stated <br />STRUCTURAL STEEL INSTALLATION <br />Subcontractor, bidder or "no work" MUST be <br />stated <br />REBAR INSTALLATION <br />Subcontractor, bidder or "no work" MUST be <br />stated <br />END OF SECTION <br />Reservoir 3 Replacement Phase 1 SUBCONTRACTORS FORM <br />Work Order No. UP3739 <br />00 43 36 <br />March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.