My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc. 6/10/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 6/10/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:19:41 AM
Creation date
6/10/2024 2:49:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
6/10/2024
Council Approval Date
12/14/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Construction of Reservoir 3 Phase 1
Tracking Number
0004389
Total Compensation
$27,977,792.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 11/17/2025 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Change Order No. <br />Change Order Effective Date: <br />As allowed by the contract, the City directs the Contractor as follows: <br />1. The Scope of Work shall be changed to the extent described in Exhibit A. <br />2. The Contract Sum shall be adjusted as described in this Change Order. <br />3. The Contract Time of the Contract, and contractually scheduled completion <br />date, shall be adjusted to the extent described in this Change Order. <br />4. Unless the Contractor timely and properly follows the procedures in the Contract <br />Documents for seeking further equitable adjustment of time and compensation, <br />including, but not limited to, delays, impacts, inefficiencies, overhead, and direct <br />and indirect costs, and except as otherwise expressly provided herein, the <br />Contractor will be barred from (a) asserting any claim for further adjustment of <br />time and compensation arising out of, or relating to, the charges described in this <br />Change Order or Work described in Exhibit A and (b) asserting an equitable <br />adjustment of time or price arising earlier than the date of this Change Order. This <br />provision does not apply to requests for equitable adjustment of time or price for <br />which the Contractor timely and properly provided notice of a differing site <br />condition, protest, dispute, claim or Contract Claim as required by the Contract <br />Documents. If the Contract Documents establish a time period for notice of a <br />differing site condition, protest, dispute, claim, or Contract Claim that ends after <br />the date of this Change Order, but relates to work performed prior to the date of <br />this Change Order, then this provision does not apply if the Contractor timely and <br />properly submits such notice. <br />5. This Change Order only changes the Contract between Contractor and City <br />to the extent explicitly provided herein. <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 63 95 <br />CHANGE ORDER - UNILATERAL March 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.