Contract Sum: The price in dollars stated in the Contract to be paid by the Owner to the Contractor for <br />the Work described in the Contract Documents, as modified by any Change Orders. <br />Contract Time: The duration of the Project as stated in the Contract and as modified by any Change <br />Orders. <br />Contractor: The individual or entity with whom Owner has entered into the Agreement. <br />Day: Calendar day, unless explicitly stated otherwise. <br />Delay: Any increase of the duration of the critical path of the Project. <br />Dispute: Any controversy or disagreement. <br />Drawings: That part of the Contract Documents that graphically shows the scope, extent, and character of <br />the Work to be performed by Contractor. Shop Drawings and other Contractor Submittals are not <br />Drawings as so defined. <br />Effective Date of Agreement: See 18.10 EFFECTIVE DATE. <br />Engineer: An individual or entity retained by the Owner to be the Owner's representative with regard to <br />matters of design intent. The terms "Owner's Representative", "Engineer" and "Architect" are <br />interchangeable. <br />Equipment: Mechanical, electrical, instrumentation, or other devices with one or more moving parts, or <br />devices requiring an electrical, pneumatic, electronic, or hydraulic connection. <br />Extended Overhead: The increase in Overhead costs attributable to an extension of Contract Time. <br />Extra Work: Providing materials and Equipment and the performance of Work not directly called for in, <br />or implied by, the Contract Documents, such that Contractor would be entitled to an adjustment of <br />Contract Sum and possibly an extension of Contract Time. <br />Field Order: A written order issued by Owner's Representative that requires minor changes in the Work, <br />but does not involve a change in the Contract Sum or the Contract Time. <br />Final Acceptance: Formal action by Everett City Council determining that all of the Contractor's Work <br />has been completed, except for any landscaping maintenance. <br />Float: The amount of time between the early start date and the late start date, or the early finish date and <br />the late finish date of any activity in the project schedule. <br />Force Account: Costs of performing Work as defined in 9.6. FORCE ACCOUNT. <br />Furnish, Install, Perform, Provide, Supply: The word "Furnish" or the word "Install" or the word <br />"Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage <br />thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, <br />equipment, and everything necessary to perform the Work indicated, unless specifically limited in the <br />context used. <br />General Conditions: This Section 00 72 00 of the Contract Documents. <br />May: Conduct that is permitted, but not required. <br />Milestone: A principal event specified in the Contract documents relating to an intermediate completion <br />date or time prior to Substantial Completion of all the Work. <br />Notice: A signed, written communication by the Contractor to the Owner as described in ARTICLE 10. <br />NOTICE TO OWNER. <br />Notice of Award: The written notice from the City of Everett to the successful Bidder signifying the <br />City's acceptance of the Bid. No Contract is formed until the Effective Date. <br />Notice to Proceed: The written Notice from the Owner or Owner's Representative to the Contractor <br />authorizing and directing the Contractor to proceed with the Work and establishing the date on which the <br />Contract Time begins. Multiple and partial Notices to Proceed may be issued on a single Project. <br />Reservoir 3 Replacement Phase 1 <br />Work Order No. UP3739 00 72 00 <br />GENERAL CONDITIONS March 2024 <br />