My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
211 E VIEW RIDGE DR 2023 Plans 2024-06-11
>
Address Records
>
E VIEW RIDGE DR
>
211
>
Plans
>
211 E VIEW RIDGE DR 2023 Plans 2024-06-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2024 1:04:37 PM
Creation date
6/11/2024 1:04:22 PM
Metadata
Fields
Template:
Address Document
Street Name
E VIEW RIDGE DR
Street Number
211
Permit
B2310-084
Year
2023
Notes
REPLACE DECK, STRUCTURAL, FOOTINGS AND RAILINGS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Post to Beam Connection w/ Knee Brace <br /> Sheathing (Knee braces are required on posts greater than 4 feet in height.) <br /> Siding <br /> Or 1/3 the height of the post. Beam splices must occur <br /> Flashing whichever is greater <br /> I over posts with 1-1/2"min-trying <br /> DeckingCorrosion resistant, * ruin <br /> III <br /> metal column cap. Girder beam <br /> ►� Follow manufacturer's <br /> Joists ^�� Follow <br /> instructions, ,. # i <br /> ,,,..- } <br /> Joist Hangers 1 ■• 'z <br /> i VI 1 N,. si, <br /> Treated 2x ledger 2"min. ". <br /> Allilibmilii <br /> c <br /> � 45* 4 x 4 knee brace <br /> ►�� <br /> 750#capacity holddown device <br /> at 4 locations evenly distributed Floor joists -" (1)3/8"diameter thru-bolt or 1/2" <br /> along the deck and within 2 ft of Alternate�Brace Detail: j; lag screws with washers top bottom <br /> each end. Install per manufacturer 2x4 knee brace face nailed ea.side of ', (tYPical) <br /> post and beam with 4-16d nails at each m. Pressure treated <br /> face and connection wood post <br /> Fully threaded 3/8"diameter lag screw k..:w_ ____. _...__ __.. <br /> predrilled with a minimum of 3 in 1D1.1 1D1.2 <br /> embedment into solid framing. <br /> Placement of Lag Screws and Bolts in Ledaers <br /> (Reference IRC Figure 507.2.1(1)) <br /> LAG SCREW OR BOLT STAGGER FASTENERS <br /> / IN 2 ROWS <br /> base 10071,1*standoff- 5.5"MIN FOREl <br /> AgAX 6.5"MIN FORM() <br /> 3, pat COMM* 7.5"MIN FOR <br /> in&petbetn furl <br /> if iffia special <br /> mi <br /> Finished grade 2 M N 314"MIN <br /> LEDGER <br /> i1=11�11=11- :a®ii=ii (2) .. y. 3" D1.4 <br /> 1=B=11=11=11 40 1 11 11z clear io bottom.H .�-., r --„„ , .. 1 11 11 tooting,1=11=11=11=11=11=11=11r-711=-711=11= la bearFooting <br /> on <br /> 11 11=1i=11 1111111 11-i1: <br /> mdistarbed <br /> a , <br /> er T-TJennifer McCord <br /> EILMAN 211 E View Rid a Drive PHONE:425-773-5859 <br /> D1.3 CONSTRUCTION SECTION g <br /> LETTER Everett <br /> A WA <br /> 98203 <br /> 6933 184th St SE PHONE:425-287-5775 Mil' <br /> PAGE DRAWN BY: PAGE: <br /> Snohomish andy@heilmandeckandfence.com NUMBERS SCALE: As Noted D 1 <br /> WA <br /> 98296 DATE: Thursday, October 12, 2023 Struc ure <br />
The URL can be used to link to this page
Your browser does not support the video tag.