Laserfiche WebLink
DECK RAIL POST TO RIM BOARD <br /> Post Cap(2) CONNECTION DETAILS <br /> Mountin Bracket(4) —.' ""i -- --- Top Rail or' According to the current International Residential Code (IRO and International Building Code (IBC), guardrails and <br /> - E t -- Support Rail(2) handrails must be designed to withstand c single concentrated load of 200 pounds in any direction. A critical part of <br /> r <br /> ,., - - _ _ - _ - - _ ^ - ' _ this connection is making a strong connection between the guardrail post and the rim board of the deck. In most cases, <br /> - Composite <br /> Baluster a 1/2" through-bolt or carriage bolt is used to make this connection. W t- installed as instructed I 's bulletin, the <br /> (23 in 10'Section) <br /> (18 in 8 Section) ThruLOK System can replace 1/2" bolts, meeting the 200 pound a' ign load for this part of the connection. <br /> (13 r 6'Section) <br /> Post Sleeve(2) <br /> Aluminum APPLICATIONS <br /> Support Block(2) Baluster <br /> (25 in 10'Section)(20 in 8'Section) Thr �[UL ,\ <br /> (15 in 6'Section) <br /> �\ <br /> E.-1-) i N _ Universal ,, `�, <br /> I - Bottom Rail <br /> r__.._.__.____.___._ Foot Block <br /> I (3 in 10'Section) 4�c�Post Skirt(2) Q CI r J� (2 in 8'Section) y} a0' <br /> (tin 6 Section) <br /> LD3.1 � 7:NIN:''''' '''''''''-‘;'-'''.----- <br /> P3.2 <br /> DECK POST TO SINGLE RIM JOIST DECK POST TO DOUBLE RIM OR <br /> SINGLE RIM WITH BLOCKING <br /> Jennifer McCord <br /> REILMAN211 E View Rid e Drive PHONE:425 773 5859 <br /> SECTION g <br /> CONSTRUCTION A SETTER Everett <br /> WA <br /> 98203 <br /> 6933 184th St SE PHONE:425 287 5775 NW PAGE DRAWN BY: PAGE: <br /> Snohomish andy@heilmandeckandfence.com NUMBERS SCALE: As Noted EJ31" <br /> WA <br /> • 98296 DATE: Thursday, October 12, 2023 Composite ail <br />