My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5704 SOUND AVE 2023 Plans 2024-08-07
>
Address Records
>
SOUND AVE
>
5704
>
Plans
>
5704 SOUND AVE 2023 Plans 2024-08-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2024 1:28:41 PM
Creation date
6/11/2024 1:33:45 PM
Metadata
Fields
Template:
Address Document
Street Name
SOUND AVE
Street Number
5704
Permit
B2312-056
Year
2023
Notes
UNDERPINNING EXISTING FOUNDATION
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z <br />0 <br />a <br />0 <br />o <br />g <br />z <br />J z <br />Q <br />m = C Z <br />z <br />Z <br />9 z <br />1!'1 <br />��W <br />o. <br />oo`�oW <br />d tL <br />N a Z 0 <br />O <br />m Ln Y <br />NN � z <br />O =5 <br />a� <br />ai <br />v a 0 <br />v <br />��v `+ <br />E< c <br />ru <br />o, Cl <br />Q E U <br />a n 0 <br />v <br />Q a in O <br />APPROVED <br />Office or Community, Planning & Economic Development <br />PLANNING DEPARTMENT <br />Na,n 1 4 DATE:,_LLq <br />v <br />4-1M a, <br />+, <br />a Ul <br />0 <br />�I <br />Q1 <br />W <br />m <br />3 <br />aa) <br />rr <br />N <br />Fiy Q) <br />t�J <br />N <br />W (A <br />v1J <br />Q <br />O E <br />H a <br />(E) DECK TYP <br />L <br />(E) CONC PATIO <br />w <br />0 <br />(E) DRIVEWAY/PRIMARY <br />CONSTRUCTION ACCESS <br />CITY OF EVERETT <br />iEVIEWED FOR PERM! R 19.4, <br />5g 4 <br />320' <br />- 330' <br />Additional Permits Are Required 0' 30' 60' 90' <br />For This Project To Include: <br />❑ Plumbing ❑ Sprinkler SCALE: 1 "=30'-O" <br />❑ Mechanical ® Fire Alarr SITE PLAN <br />❑ Electrical <br />S PJ�U a U ►�'Mf1,z'-(Lo <br />PROJECT DATA <br />\ PROJECT DESCRIPTION: UNDERPINNING OF EXISTING RESIDENCE <br />FOR FOUNDATION STABILIZATION <br />PROJECT ADDRESS: 5704 SOUND AVE., EVERETT, WA 98203 <br />COUNTY: SNOHOMISH COUNTY <br />PARCEL NO: 00396700101400 <br />BUILDING CODE: 2018 IBC & 2018 WASHINGTON BUILDING CODE <br />ZONING CODE: EVERETT MUNICIPAL CODE <br />.? i <br />—N <br />ZONING: 111 <br />SITE AREA: 36,590 SF <br />LOT DIMENSIONS: AS SHOWN <br />EXPIRES: 12/24/24 <br />EXISTING BUILDING: 1,397 SF ((2) STORY) <br />LEGAL DESCRIPTION: BRIDLE PARK BLK 001 D-00 — LOT 14 TGW <br />TR 15 EXC BEG NWLY COR TR 15 TH S20*28 45E ALGWLY LN TR 15 <br />23.43FT TAP OF CRV TH SELY ALG ARC OF CRV TO L HAVG RAD 116.16FT <br />C/A 04*13 38 8.57FT TAP ON SD CRV TH TANG OF WH BEARS N65*17 37E <br />TH N49*5514E 95.36FT TAP ON NLY LN TR 15 TH S69*31 15W ALG SD <br />NLY LN 90.16FT TO NWLY COR & POB TGW TR 16 EXC W 116.16FT AS <br />MEAS ALG NWLY & SELY LN SD TR 16 TGW FDP BAAP ON SELY LN TR 16 <br />WH ISN69*31 15E 90.16FT FR SWLY COR TR 16 TH CONT N69 ��E g (� vn E <br />SD SELY LN 26FT TO COMMON COR TRS 14 & 15 TH N20*28 <br />WLY LN 9.26FT TH S49*55 14W 27.6FTTPB <br />OWNER INFORMATION: DAN KEFFLER DEC 2 6 2023 <br />DANKEFFLER@UNDERWATERSPORTS.COM <br />PHONE: (425) 308-2613 CITY OF EVERETT <br />SITE PLAN NOTES Permit Services <br />1. ALL WORK AND MATERIAL SHALL CONFORM TO THE REQUIREMENTS OF THE CITY OF <br />EVERETT DESIGN STANDARDS. <br />2. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND LICENSES BEFORE <br />STARTING CONSTRUCTION. <br />3. THE CONTRACTOR SHALL NOTIFY THE ENGINEER, CITY OF EVERETT 24 HOURS BEFORE <br />STARTING CONSTRUCTION OR RESUMING WORK AFTER SHUTDOWNS, EXCEPT FOR NORMAL <br />RESUMPTION OF WORK FOLLOWING SUNDAYS OR HOLIDAYS. <br />4. THE CONTRACTOR SHALL ASSIST THE ENGINEER IN PREPARING AS —CONSTRUCTED <br />DRAWINGS. <br />5. CONTRACTOR TO SPECIFY EXACT LOCATIONS OF UTILITY STUBS. THE CONTRACTOR <br />ASSUMES ALL LIABILITY AND RESPONSIBILITY FOR ALL UTILIY PIPES, CONDUITS OR <br />STRUCTURES SHOWN AND NOT SHOWN ON THESE DRAWINGS AND IS REQ'D TO TAKE <br />DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES ON SITE <br />6. ALL EXCAVATION REQ'D FOR PIER INSTALLATION SHALL BE COMPLETED BY HAND <br />7. ALL CONSTRUCTION VEHICLES SHALL REMAIN ON THE PAVED STREET, DRIVEWAY, OR <br />AUTHORIZED TRAVEL PATH. <br />8. NO PROPOSED HORIZONTAL OR VERTICAL EXPANSION <br />9. GRADING MUST BE STABILIZED BY OCTOBER 31 st. NO EXCAVATION OR FILL <br />PLACEMENT MAY BE PREFORMED BETWEEN OCTOBER 31st AND APRIL 1st <br />Q <br />0— <br />z <br />z <br />W <br />CL <br />Cc <br />W <br />Lj <br />6 <br />z <br />zQCID <br />co <br />O <br />I— <br />I..LI <br />U <br />Z <br />� <br />j <br />0 <br />11J <br />g <br />O <br />Cn <br />W <br />z <br />(n <br />� <br />O <br />� <br />Ir <br />W <br />O <br />W <br />LL <br />w <br />J <br />W <br />tL <br />Y <br />Q <br />SITE PLAN <br />REVISIONS <br />PROJECT NO: <br />MFR23-244 <br />DESIGNED BY: <br />JB <br />DRAWN BY: <br />JB <br />CHECKED BY: <br />JSF <br />DATE: <br />12.13.2023 <br />SHEET NO: <br />sto <br />
The URL can be used to link to this page
Your browser does not support the video tag.