Laserfiche WebLink
Table A, B,and c Notes: Causes of Improper O peration <br /> 1. Reliable standard solenoid valve for(a) M oriel DDX deluge 1. Review the distance from the releasing panel and check <br /> and preaction system S (b) M oriel DDV Electric Release del- the available voltage at the connection to the solenoid. The <br /> uge system,and (c) M odel DDV UL Listed Rem de Resetting voltage should be at least 85%of the nam Eplate rating. <br /> deluge system. 2. C heck the electrical system by energizing the releasing circuit <br /> 2. N on-standard,special order solenoid valves.Allow additional to the solenoid valve. A metallic "click" that signals that the <br /> lead time(contact Reliable sales). solenoid valve is working. If you do not hear the click check <br /> 3. F M does not approve solenoid voltages other than 24 VDC. for loose wires, connections, blown fuses, open circuits or <br /> 4. Reliable standard solenoid valve for(a) M oriel DDV FM grounded coil. Check for broken lead wires or bad splice <br /> Approved Rem de Resetting trim and(b) M oriel DDV Rem de connections. <br /> Resetting Pressure Regulating deluge system. 3. C heck for open-circuited (burned out) coil and replace if <br /> 5. International approvals and applications only. necessary. Confirm supply voltage does not exceed the coil <br /> nam eplate rating. <br /> Maintenance <br /> The owner is responsible for m antaining all parts of the fire Service <br /> protection system in proper operating condition.Any system Non-operational solenoid valves,or solenoid valves showing signs <br /> m antenance or testing that involves placing a system com ponent of sluggish response, leakage, or other unusual operation M LIST <br /> out of service m aj elim hate the fire protection that is provided by BE IM M®IATELY REPLACED. <br /> the fire protection system. <br /> Solenoid valves shall periodically be given a thorough inspection G Larantee <br /> and test. NFPA 25, "Inspection,Testing, and M antenance <br /> of Water Based Fire Protection System S" provides m him un For Reliable Autom etic Sprinkler Co., Inc. guarantee, term S and <br /> requirem eats. conditions,visit www.reliablesprinkler.com. <br /> The frequency of the testing m aj vary due to contam hated water <br /> supplies,corrosive water supplies,or corrosive atm cspheres. Q idering Inform ation <br /> Solenoid valves should be operated at least once a m cnth and <br /> checked for cracks,corrosion,and leakage. Im m eliately replace Provide description and part num bzr from Table A, B,or C. <br /> any valve found to be inoperable or im paired. <br /> Before closing a fire protection system control valve for inspection <br /> and/or m antenance, perm'sion to take the system out of service <br /> m ust be obtained from the proper authorities and all persons who <br /> m ght be affected by the outage. Particular care m est be taken <br /> to notify those responsible for m cnitoring the system and the fire <br /> service organization responsible for the response in the event of <br /> a fire.After putting the system back in service, notify the proper <br /> authorities and all persons who were affected by the outage. <br /> Replacem ant of a solenoid valve should only be done by trained <br /> and experienced personnel.A dam aged or im properly repaired <br /> solenoid could cause the fire protection system to be im paired <br /> or inoperable.This im pairm ent could result in the loss of life or <br /> property.A fire patrol or fire watch m at be required to ensure that <br /> there is not a loss of life or property.The owner is responsible to <br /> ensure that all m antenance and repair is done properly and that <br /> prudent m ensures are taken to protect life and property. <br /> Prior to taking the system out of service, ensure that the control <br /> valve for the system is closed. Before the system is placed back <br /> in service,the solenoid valve should be tested to ensure that it is <br /> functioning properly. <br /> CO <br /> O <br /> Ch <br /> O <br /> ti <br /> O <br /> W <br /> O <br /> O <br /> Bulletin 718 Page 3 of 3 z <br /> June 2022 Reliable www.reliablesprinkler.com a <br />