Laserfiche WebLink
everettwa.gov/permits I Facebook Twitter • <br /> Category 2:For official use only/disclosure permissible by law. <br /> From:Jason Bean<jason@keckgc.com> <br /> Sent: Friday, March 29, 2024 2:09 PM <br /> To: Cindy Bergsma<CBergsma@everettwa.gov>;Yin Lu <YLu@everettwa.gov> <br /> Cc:Cindy Bergsma<CBergsma@everettwa.gov> <br /> Subject: Re: [EXTERNAL] Re: B2403-002- 10115 Holly Dr-building permit scope <br /> Category 2:Sensitive information <br /> Hi Cindy, <br /> It's kind of a confusing situation.We were granted B2210-052 for structural repairs that we found on a breezeway.We <br /> then opened a second permit for deck repairs, B2211-004(I think, may have been 003, I'm not at my computer to <br /> confirm).Around this time we were informed that we only needed one permit for all building envelope repairs.So we <br /> had two open permits, I finalled B2210-052 thinking we would be covered by our other permit.After that permit was <br /> finalled,further repairs were identified.The portal showed B2210-052 with an expiration date of 3/8/24.When <br /> reached out to ask that the permit be extended I was informed that the 3/8/24 expiration date was an error and that <br /> B2210-052 was archived. I submitted a new permit application at this point. <br /> If you need further information, a phone call may be easier to work through this. <br /> Thank you, <br /> Jason Bean <br /> KECK General Construction <br /> 17311 135TH AVE NE <br /> Suite B400 <br /> Woodinville, WA 98072 <br /> Cell: 206-498-2332 <br /> Email: jason(a�keckgc.com <br /> Website: www.keckgc.com <br /> Category 2:For official use only/disclosure permissible by law. <br /> From: Cindy Bergsma <CBergsma@everettwa.gov> <br /> Sent: Friday, March 29, 2024 1:42:28 PM <br /> To:Jason Bean<jason@keckgc.com>;Yin Lu<YLu@everettwa.gov> <br /> Cc:Cindy Bergsma<CBergsma@everettwa.gov> <br /> Subject: RE: [EXTERNAL] Re: B2403-002-10115 Holly Dr- building permit scope <br /> Category 2:Sensitive information <br /> Hello Jason, <br /> We are confused. The permit B2210-052 was in fact finaled. Meaning it had all the inspections and scope of work was <br /> done. We are under the impression that the new permit B2403-002 has different scope, is that not the case? What is <br /> your intent after the other permit was finaled? <br /> 4I1 ,. <br />