My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board and Vellum LLC 6/11/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
Board and Vellum LLC 6/11/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 1:54:31 PM
Creation date
6/13/2024 1:52:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Board and Vellum LLC
Approval Date
6/11/2024
Council Approval Date
6/5/2024
End Date
12/31/2025
Department
Parks
Department Project Manager
Katherine Phillips
Subject / Project Title
Walter E Hall Community Connections Design Services
Tracking Number
0004393
Total Compensation
$89,496.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Dates <br />Project Team <br />Project Address <br /> <br />Project Services <br />2018 - 2022 <br />Board & Vellum <br />5810 156th Avenue NW <br />Redmond, WA 98052 <br />Master Planning, Public Outreach, <br />Consultant Coordination, Construction <br />Contract Administration <br />Westside Park Renovation & Master Plan Updates <br />3. Performance <br />Board & Vellum’s role on Westside Park’s renovation included thoughtfully revising a decade-old Master Plan to better <br />serve the contemporary neighborhood. Improvements included expanding the park’s connection with the Bridle <br />Crest Trail system with additional multi-modal trails and loop paths, creating a more challenging play area for all <br />ages and abilities, developing a larger sport court, updating drainage and surfacing in a large open space fields all <br />while protecting and celebrating several wetlands and streams. <br />We landed on a program that was met with community approval while remaining sensitive to Parks Department <br />needs and the site’s constraints. Close collaboration between city, community, and other stakeholders resulted in a <br />highly programmed neighborhood park with something for everyone. Two years to the date from the first community <br />meeting, Westside Park opened to the public. <br />Client <br />Reference <br /> <br />Telephone <br />Email <br />Contract Value <br />City of Redmond <br />Carrie Hite, Director <br />Parks & Recreation Strategy <br />360 379 2979 <br />chite@cityofpt.us <br />$1.9M (Initial Budget) <br />$1.5M (Construction Value) <br />12 <br />Statement of Qualifications <br />3. Performance
The URL can be used to link to this page
Your browser does not support the video tag.