My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington State Department of Ecology 6/10/2024 Amendment 2
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
Washington State Department of Ecology 6/10/2024 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 1:58:32 PM
Creation date
6/13/2024 1:58:24 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington State Department of Ecology
Approval Date
6/10/2024
Council Approval Date
5/1/2024
End Date
6/30/2025
Department
Transportation Services
Department Project Manager
Amanda Koerber
Subject / Project Title
Grant to install charging infrastructure and replace diesel buses with electric
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0002047
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 2 of 7State of Washington Department of Ecology <br />City of Everett Transportation Services <br />Transit Bus Replacement Project <br />Agreement No. AQVWTRAN-1921-CiEvTS-00012 <br />Approved Indirect Costs Rate: <br />Recipient Match %: <br />InKind Interlocal Allowed: <br />InKind Other Allowed: <br />Is this Funding Distribution used to match a federal grant? <br />Approved State Indirect: 0% <br />0% <br />No <br />No <br />Yes <br />Volkswagen Federal Settlement Task Total <br />Scrap and Replace eight (8) diesel transit buses.$1,375,000.00 <br />Installation of Electric Charging Infrastructure $259,000.00 <br />Total: 1,634,000.00$ <br />CHANGES TO SCOPE OF WORK <br />Task Number:1 Task Cost: $1,375,000.00 <br />Task Title:Scrap and Replace eight (8) diesel transit buses. <br />Task Description: <br />Under this project the RECIPIENT will purchase eight (8) all-electric transit buses to replace eight (8) 2006 or older engine <br />model year diesel powered transit buses. <br />The RECIPIENT must permanently disable AND scrap old buses . This requires a 3-inch hole cut in the engine block and <br />destruction of the chassis. A Certificate of Destruction form to assist with this is available in the EAGL system. <br />The RECIPIENT will submit the buses order to Ecology upon placing the order . <br />The RECIPIENT will make full payment for the bus, submit all invoices and destruction documents, and complete Task 2 in <br />order to receive payment. <br />ECOLOGY reserves the right to grant a one -time extension of this grant for a period of one year. <br />Task Goal Statement: <br />The goal of this project is to reduce diesel exhaust air pollution by replacing eight (8) 2006 or older engine model year diesel <br />transit buses with eight (8) new all-electric transit buses. <br />Task Expected Outcome: <br />Eight (8) old diesel transit buses replaced with eight (8) all-electric new transit buses. <br />Recipient Task Coordinator: Melinda Adams <br />Template Version 10/30/2015 <br />DocuSign Envelope ID: 4CB5A22F-8655-4EDA-B8BB-60CBE48B3180
The URL can be used to link to this page
Your browser does not support the video tag.