Laserfiche WebLink
Permit Number: PV2401-003 <br /> RESIDENTIAL PHOTOVOLTAIC Permit Type: RESIDENTIAL PHOTOVOLTAIC <br /> City of Everett Permit Services Permit Subtype: <br /> EVERETTPermitServices@everettwa.gov 1 425.257.8810 Date Issued: 1/9/2024 <br /> Request Inspections:OnIinePerm its.everettwa.gov <br /> WASHINGTON <br /> PERMIT INFORMATION: <br /> SITE ADDRESS: 703 LAUREL DR PARCEL#: 00561901501200 <br /> DESCRIPTION: Rooftop Solar PV Installation TENANT: <br /> NOTES: PERMIT VALUATION: $4,776.00 <br /> Installation of rooftop Solar Photovoltaic System consisting of 1.64kVV- (4) REC 410W. (4) Enphase IQ7A. Expansion. <br /> CONTACT INFORMATION: <br /> OWNER:COLEMAN DAN&JEANNETTE PHONE: (425)359-9370 <br /> MAILING ADDRESS:703 LAUREL DR EVERETT,WA 98201-4131 EMAIL:c.dancoleman@gmail.com <br /> APPLICANT: PUGET SOUND SOLAR(ELEC)LLC PHONE: (206)706-1931 <br /> MAILING ADDRESS:805 RAINIER AVE S SEATTLE,WA 98144 EMAIL: permitting@pugetsoundsolar.com <br /> CONTRACTOR: PUGET SOUND SOLAR(ELEC)LLC PHONE: (206)706-1931 <br /> MAILING ADDRESS:805 RAINIER AVE S SEATTLE,WA 98144 EMAIL: permitting@pugetsoundsolar.com <br /> STATE CONTRACTOR'S LIC#: PUGETSS932MU EVERETT BUSINESS LIC#:49544 <br /> ELECTRICAL CONTRACTOR: PUGET SOUND SOLAR(ELEC)LLC PHONE: (206)706-1931 <br /> MAILING ADDRESS:805 RAINIER AVE S SEATTLE,WA 98144 EMAIL: permitting@pugetsoundsolar.com <br /> ELECTRICAL CONTRACTOR'S LIC#: GENERAL CONTRACTOR'S LIC#: PUGETSS932MU EVERETT BUSINESS LIC#:49544 <br /> PUGETSS932MU <br /> PERMIT FEES: <br /> DESCRIPTION COMMENTS FEE AMOUNT DATE PAID <br /> Percent Credit Card Fee $5.76 1/9/2024 <br /> Percent Credit Card Fee $5.89 1/9/2024 <br /> STATE SURCHARGE IRC $6.50 1/9/2024 <br /> 12 CIRCUITS ALTER/ADD 1-2 $75.00 1/9/2024 <br /> BUILDING PERMIT CONSTRUCTION FEE $169.00 1/9/2024 <br /> TOTAL:$262.15 <br /> PERMIT REQUIREMENTS: <br /> All work shall be subject to field inspection. <br /> All work be constructed per the plans approved by Everett Permit Services.Approved plans must remain on job-site at all times. <br /> Manufacturer Specification's must remain on job-site at all times and be available for Inspectors. <br /> Electrical Final Inspection Required <br /> Building Final Inspection Required <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and all claims for <br /> damages,costs,expenses,or causes of action that may arise because of installation and maintenance of the improvement or other right-of-way use here to <br /> applied for and further agrees to remove same upon notice from the City and to replace public property damaged thereby. <br /> VALIDITY/EXPIRATION: <br /> Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion.This permit <br /> may be canceled by the city upon any stoppage of work on this project over 180-day duration.Each inspection extends the expiration date 180 days to keep the <br /> EVERETT Permit No.: PV2401-003 Page 1 of 2 <br />