My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006 HIGHLAND AVE 2024-07-01
>
Address Records
>
HIGHLAND AVE
>
2006
>
2006 HIGHLAND AVE 2024-07-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2024 8:50:44 AM
Creation date
6/21/2024 1:44:34 PM
Metadata
Fields
Template:
Address Document
Street Name
HIGHLAND AVE
Street Number
2006
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PPurelight Power <br /> February 16, 2024 <br /> Subject: Proposed Solar Panel Installation <br /> Stephanie & Robert Hardgrave Residence, 2006 Highland Ave, Everett,WA <br /> To Whom it May Concern, <br /> Our engineering department has reviewed information, gathered by our field crews, related to the proposed solar <br /> panel installation at the above-referenced address. The purpose of our review was to determine the structural <br /> adequacy of the existing roof. Based on our review and analysis of the available information, and in accordance <br /> with governing building codes, it is our professional opinion that the existing structure is permitted to remain <br /> unaltered for the proposed solar installation. <br /> Design Parameter Summary <br /> Governing Building Code: 2018 Washington Building Code (2018 IBC) <br /> Risk Category: II <br /> Design Wind Speed: 92 mph (per ASCE 7-16) <br /> Ground Snow Load: 30 psf <br /> Roof Information <br /> Roof Structure: 2x6 Manufactured Trusses @ 24" O.C. <br /> Roofing Material:Asphalt Shingles (2 layers) <br /> Roof Slope: 45° <br /> Roof Connection Details <br /> Lag Screws: 5/16" diameter min., with min. 2.5" embedment into framing members, at 48" O.C. max, staggered <br /> Locations per design drawings <br /> Note:Required embedment length excludes the tapered tip of the screw,and embedment into sheathing. <br /> Analysis <br /> The proposed installation complies with the requirements of WAC Section 51-51-03240 R324.4 (Exception) and is <br /> therefore deemed adequate to support the load of the rooftop solar system. <br /> Specifically: 1) the system is designed for the local wind speed; 2) the ground snow load does not exceed 70 psf; 3) <br /> the total dead load of all items is less than 4 psf (actual value is approximately2.75 psf); 4) Modules are not <br /> mounted more than 18" off the roof; and 5) Supports are installed such that the dead load is spread across roof- <br /> framing members and does not exceed 50 lbs at any point. <br /> Wind uplift on the panels has been calculated in accordance with the relevant provisions of ASCE 7-16.This loading <br /> has been used to verify the adequacy of the connection specified above. Connection locations should be in <br /> accordance with design drawings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.