My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2520 19TH ST 2024-07-01
>
Address Records
>
19TH ST
>
2520
>
2520 19TH ST 2024-07-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 9:26:19 AM
Creation date
6/21/2024 1:54:44 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH ST
Street Number
2520
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: PV2403-004 Description: Install 26 panels in 3 arrays on a roof-mounted 10.530kW <br /> PV <br /> Applied:3/22/2024 Approved: 3/26/2024 Site Address: 2520 19TH ST <br /> Issued:3/26/2024 Finaled: City,State Zip Code: EVERETT,WA 98201-2503 <br /> Status: PERMIT ISSUED-ONLINE Applicant: Mary Dinsmore-Smith <br /> Parent Permit: Owner: Brian Hardison <br /> Parent Project: Contractor:TML INTERNATIONAL LLC(CONST) <br /> Details: <br /> **MANUFACTURER SPEC TO BE ONSITE FOR BLDG INSPECTOR TO REFER TO** <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 4/15/2024 4/15/2024 BLDG 16-FINAL RAKEEB KHAN APPRVD-PERMIT eTRAKiT Inspection Request <br /> FINAL <br /> Notes: <br /> 4/11/2024 9:13 AM Mary Dinsmore-Smith <br /> Contact Name:Mary Dinsmore-Smith <br /> Site Address:2520 19TH ST <br /> Phone:4252736959 <br /> e-Mail:permit@infinitysolarusa.com <br /> Inspected from the ground. <br /> 4/15/2024 4/15/2024 ELEC 10-FINAL** MIKE BEARDA APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 4/11/2024 9:13 AM Mary Dinsmore-Smith <br /> Contact Name:Mary Dinsmore-Smith <br /> Site Address:2520 19TH ST <br /> Phone:4252736959 <br /> e-Mail:permit@infinitysolarusa.com <br /> Inspector MCB changed the inspection assignment from MCB to MCB <br /> Ok pv system <br /> I <br /> Printed:Tuesday, 16 April,2024 1 of 1 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.