Laserfiche WebLink
DEMOLITION PERMIT APPLICATION <br /> EVERETT SUBMITTAL INSTRUCTIONS:CITY OF EVERETT PERMIT SERVICES <br /> ONS:Drop off hard copy paper application&plan to 3200 Cedar Street 2nd Floor Intake Drop Box. <br /> WASHINGTON CONTACT INFORMATION:(P)425.257.8810 1(E)everetteps@everettwa.gov I(W)everettwa.govlpermits <br /> (Blue or Black ink Only Please) t PROJECT SITE INFORMATION <br /> PROJECT SITE ADDRESS: STREET ! e, '}Ll i 1 t y' PARCEL M <br /> CRY j ,'v '� �;' -� STATE. UUZIP ,r . <br /> SUITEIUNIT#: FLOOR#: ADDITIONAL LOCATION INFORMATION: <br /> TENANT/BUSINESS NAME(if non-residential): 1-1 <br /> CONTACT INFORMATION <br /> OWNER NAME: <br /> OWNER MAILING ADDRESS: sTR aT f ! j 't "j W <br /> CITY l.W. fj. 6=5 STATE J ZIP <br /> OWNER PHONE: " -�� - G , OWNER EMAiL: ;et j '41 kc ko e, it; <br /> I. <br /> CONTRACTOR CONTACT NAME: i QV <br /> WA STATE CONTRACTOR LICENSE#(REQUIRED): CITY OF EVERETT BUSINESS LICENSE 4(REQUIRED): <br /> CONTRACTOR ADDRESS: STREET <br /> CITY STATE ZIP <br /> CONTRACTOR PHONE: CONTRi1CTOR EMAIL: <br /> PRIMARY CONTACT: OWNER ❑CONTRACTOR ❑OTHER(Please Specify) <br /> CONTACT NAME: CONTACT PHONE: <br /> CONTACT EMAIL: <br /> DEMOLITION PERMIT INFORMATION <br /> VALUATION OF WORK:$ 10 OC) 12-0 ASSOCIATED PERMITtLAND USE PROJECT#(if applicable): <br /> (Valuation shat€Include the prevaring fairs market value of all labor,materials,and equipment needed to complete the%vork,whetheractuualty paid or not.) <br /> BUILDING TYPE: ❑SFR ❑Townhouse ❑Duplex ❑ADU ❑Multi-Family-#Units:_ ❑Commercial NAccessory Structure <br /> DESCRIPTION OF WORK: C CAy?0VT <br /> #OF SQUARE FEET REMOVED: lj cox <br /> X <br /> #OF DWELLING UNITS REMOVED: I <br /> HISTORIC STRUCTURE: ❑Yes WNo (Contact Planning Divislon to team about addittonat requirements for historic structures(an Historic Registry or located In a Historic Overlay)). <br /> SHORELINE/FLOODPLAIN PROXIMITY:❑Yes IRNO(Contact Planning Division to learn about shoreline and floodplain requirements if structure being demolished Is ontin either). <br /> EXISTING UNDERGROUND TANK: [RND Tank ❑Yes-tank will stay in place-type: ❑Yes-tank to be removed-type: <br /> UNDERGROUND TANK SIZE: No Tank ❑Under 10,000 gallons 01 000 gallons or over <br /> PEDESTRIAN PROTEC'M QN NEEDED: ❑Yes No (Required when demolition is in close proximity to R.O.W.Include a pedestrian protection plan for review). <br /> CONSTRUCTION FENCING NEEDED: ❑Yes No (if yes,show the temporary construction fencing location on the required site plan). <br /> DUMPSTER IN R.O.W.NEEDED: ❑Yes yNo (If yes,apply for a separate Traffic Street Use Permit online at pw.evereltwa.gov). <br /> TRAFFIC CONTROL PLAN NEEDED: ❑Yes YNo (Required when sidewalk,parking lane,or travel lane closure is needed. <br /> If yes,apply for a separate Traffic Street Use Permit online at pw.everettwa.gov). <br /> SEWER SERVICE CONNECTED TO BUILDING: ❑Yes V]No (if yes,a separate Utility Permit will be issued for side sewer cap off prior to demolition). <br /> WATER SERVICE CONNECTED TO BUILDING: ❑Yes No (if yes,cap at backside of meter prior to demolition and contact Utility Billing to stop billing). <br /> ELECTRICITY CONNECTED TO BUILDING: ❑Yes No(it yes,apply for separate Electrical Permit for disconnect and disconnect services prior to demolition). <br /> ABATEMENT ACKNOWLEDGMENTS: 7'he applicant is responsible for compliance with all local,state,and federal laws,codes,and regulations whether or not <br /> described herein.By checking the box next to each abatement type below,1,the ownerlapplicant,acknowledge my responsibility,agree to the teras and conditions of the <br /> requirements,and will abide by the requirements during construction. <br /> Asbestos Abatement:Required in line with Puget Sound Clean Air Agency(PSCAA)tittpsJIpscleanair.gov/.An Asbestos?Demolition Notification must be submitted <br /> to PSCAA before any asbestos removal or demolition begins and havo the appropriate abatement report documonlation on-site during construction. <br /> Lead Paint Abatement:Contact the Snohomish Health District(SHD)https:ifvA-Av.snohd.orgl for applicable lead paint abatement requirements. <br /> Rodent Abatement:Proper rodent abatement shalt be conducted prior to demolition. <br /> SITE PLAN REQUIREMENTS:Submit 2 hard copies of site plan showing buildings to be demolished with permit application to Permit intake Drop Box or attach <br /> electronic site plan with permit application if submitting electronically.Plans shall be in separate,compiled pdf,8.5x11 or 11x17 size.Naming convention: <br /> Address DemoPermitPlans. <br /> ACKNOWLEDGEMENT 1 have reviewed this application and confirm the information contained herein is true and correct.Work done pursuant to this permit must comply with <br /> current federal,state,and local law.Tho granting of a permit only authorizes approved work and no deviations there From.Deviations must first be authorized in writing from the <br /> Building Official before being authorized under any circumstance.t am the owner,or i am authorized by the owner of this property to perform the work for which application is made, <br /> and i comply wit the State Contractors Lacv 18,27 RCW and 296.200A WAC. <br /> f City of Everett Official Use Only <br /> PERMIT ft <br /> Ow6erltlitllidrlzed Agent Si nal re Dae (R,evised 2/812021) <br />