My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2702 59TH ST SW 2024-07-05
>
Address Records
>
59TH ST SW
>
2702
>
2702 59TH ST SW 2024-07-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2024 1:40:32 PM
Creation date
6/24/2024 10:04:32 AM
Metadata
Fields
Template:
Address Document
Street Name
59TH ST SW
Street Number
2702
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD REPORT <br />Project: Miller Residence Slope Stabilization <br />OELSon OEOTECHnICAL Client: Dennis & Chelsea Miller <br />OSSOCIATES, InC Location: 2702 — 59th Street SW <br />Everett, Washington <br />17311 135th Ave. NE #A-500 Weather: Partly Cloudy; 55 *F <br />Woodinville, WA 98072 <br />(425) 486-1669 FAX 481-2510 Purpose of Geotechnical Consultation and <br />105 Palouse Street Visit: Construction Monitoring <br />Wenatchee, WA 98801 <br />(509) 665-7696 <br />NGA File: 13333B-22 <br />Date: 10/24/2023 <br />Report No: 6 <br />Page 1 of 2 <br />By: ABR <br />We visited the site today at the request of the earthwork contractor on behalf of the homeowners, to provide geotechnical <br />consultation services for the proposed slope stabilization project located at the above address in Everett, Washington. <br />Upon arrival, we met with the earthwork contractor. The driller had completed the timber lagging installation for the soldier <br />pile wall and demobilized equipment. The void space between the back of the lagging wall and the cut was filled with 5/8- <br />inch clean crushed rock. The earthwork contractor was in the process of installing the level spreader dispersion trenches <br />along the toe of the shoring wall. The trenches were approximately 2-foot in depth and width (perpendicular to the wall face). <br />Filter fabric was placed along the prepared trench excavations and pressure treated notched drain boards along the <br />downslope portion of the dispersion trenches were placed. The contractor planned to backfill the level spreader trenches <br />with clean crushed rock and then begin final grading of the area between the wall and the southern grading limits. <br />We recommended the finished grade surface below the wall is protected from erosion through placement of jute mat and <br />hydroseed for areas of exposed soil, the contractor agreed. <br />We have been providing geotechnical consultation and construction monitoring services on a part-time basis. Our findings <br />and conclusions are based on specific observations made while on site. Based on our observations, the level spreaders <br />excavations were prepared in accordance with the project plans and our recommendations. We will continue to monitor <br />site excavation. <br />Attachment: Site Plan <br />Distribution: <br />Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.