Laserfiche WebLink
s< <br />mmr� <br />y n <br />0 <br />N m <br />O A N <br />N <br />w CID � <br />CID <br />a m <br />v C <br />A ' <br />D m m <br />(. <br />r: F <br />(2) %"0x4" HOG LAG SCREW <br />WI ANGLED WASHER. <br />PLACED Pz"CLR <br />OF END AND CENTERED ON SOLDIER PILE <br />LAGGING 5" APART PER SCHEDULE <br />,\ PERP�N <br />FILL WI GROUT <br />I gill <br />PT TIMBER LAGGING <br />PER ELEVATION <br />2Y2' BLARING MIN <br />CORNER DETAIL <br />SH3 SCALE 3I4" = P-0" <br />SOLDIER PILE SHORING PROCEDURE <br />1. ACCURATELYLOC,ATED PILE SHAFTS AS SPECIFIED. ALLOWABLE TOLERANCE SHALL BE <br />2" INANYDIRECTION. <br />2. DRILL SHAFT TO A MINIMUM 3" DEEPER THAN SPECIFIED SOLDIER PILE EMBEDMENT <br />DEPTH. PLACE SOLDIER PILE IN SHAFT AND BACK FILL WITH LEAN CONCRETE. <br />3. START EXCAVATION AND LAGGING IN LIFTS NOT GREATER THAN 4 FEET. CONTINUE <br />THIS PROCEDURE UNTIL THE FINISH EXCAVATION IS REACHED. <br />4. PRIMED FINISH TO EXTEND 24" BELOW BOTTOM OF EXCAVATION FENCE BYOWNER <br />PT 412 CAP WI6" SDSAT 12" O.C. <br />FINISHED GRADE <br />IG <br />BOTTOM OF—\ <br />EXCAVATION <br />SLOPE PER PLAN <br />w w <br />W SOLDIER PILE <br />= PER SCHEDULE <br />a y <br />60 <br />W W <br />� W <br />SHAFT DIAMETER PER SCHE <br />a TYPICAL SECTION <br />SH3 SCALE 314" = P-0" <br />o <br />(2%J-0 4" HOG LAG SCREW <br />€ w <br />EA LAGGING. PLACED 1Y2" CLR <br />o z o <br />c <br />OF END AND CENTERED ON <br />PILE & SHAFT LAGGING 5"APART <br />= <br />o 3 p <br />REO'D FOR TOP BOARD ONLY <br />o = g <br />N U <br />DRILLED SHAFT <br />8 o L2 w <br />g ° - BACKFILLED WITH <br />" w <br />¢ <br />I <br />- CONCRETEISLURRY <br />aop <br />F�Fg <br />$p <br />Z � <br />Ed <br />O <br />U <br />I <br />y <br />22 <br />_ '.i <br />PT 4x TIMBER <br />NAGGING <br />DRAIN ROCKPER CIVIL <br />�n - <br />Lu <br />SOLDIER PILE <br />> ¢ s <br />PER SCHEDULE <br />t o r <br />m <br />V M N <br />4N <br />N <br />fp d <br />I <br />WAS <br />e <br />n <br />N <br />1 <br />2 <br />to TYPICAL DETAIL <br />SH3 SCALE 314" = P-0" <br />Lu <br />U <br />z <br />W <br />C:) <br />C J <br />W 05 — <br />~ N <br />W � <br />TIMBER LAGGING <br />W � <br />DESIGNED FOR <br />ACTIVE + SEISMIC <br />W = <br />35 PSF <br />PRESSURE <br />J rn N <br />70 PCF <br />o <br />1 <br />S N W <br />N N <br />2 <br />L W <br />SCHEMATIC PLAN <br />W <br />z <br />PASSIVE PRESSURE <br />- <br />_ <br />DETAILS <br />ACTS OVER SCE <br />PILE WIDTH <br />— <br />DATE: JUNE 16, 2023 <br />— <br />PLAN NUMBER: <br />SH3 <br />LOADING DIAGRAM <br />SCALE 314" = P-0' <br />