Laserfiche WebLink
DRAINAGE REPORT <br />Miller Residence Drain <br />ELEMENT NO. 3 — CONTROL FLOW RATES <br />If necessary, in addition to silt fencing, wattles or sediment traps may be used to control flows <br />downstream of construction. The specific BMPs related to controlling flow rates may include: <br />• Wattles (BMP C235) <br />• Sediment Trap (BMP C240) <br />ELEMENT NO. 4 — INSTALL SEDIMENT CONTROLS <br />June 2023 <br />All stormwater runoff from disturbed areas shall pass through an appropriate sediment removal BMP <br />before leaving the construction site. Sediment barriers and other BMPs intended to trap sediment on - <br />site shall be constructed as one of the first steps in grading. The specific BMPs used for controlling <br />sediment on this project include: <br />• Silt Fence (BMP C233) <br />• Sediment Trap (BMP C240) <br />In addition, sediment will be removed from paved areas in and adjacent to construction work areas <br />manually or using mechanical sweepers, as needed, to minimize tracking of sediments on vehicle tires <br />away from the site and to minimize wash off of sediments from adjacent streets in runoff. <br />Any accumulated sediment shall be removed after construction is complete. <br />ELEMENT NO. 5 — STABILIZE SOILS <br />Exposed and unworked soils shall be stabilized by application of effective BMPs to prevent erosion <br />throughout the duration of the project. The specific BMPs for soil stabilization that shall be used on this <br />project may include: <br />• Buffer Zones (BMP C102) <br />• Temporary and Permanent Seeding (BMP C120) <br />• Dust Control (BMP C140) <br />In general, cut and fill slopes will be stabilized as soon as possible and soil stockpiles will be temporarily <br />covered with plastic sheeting. All stockpiled soils shall be stabilized from erosion, protected with <br />sediment trapping measures, and where possible, be located away from storm drain inlets and drainage <br />channels. <br />ELEMENT NO. 6 — PROTECT SLOPES <br />The existing slopes shall be protected in a manner that minimizes erosion. The following specific BMPs <br />may be used to protect slopes for this project: <br />• Nets and Blankets (BMP C122) <br />ELEMENT NO. 7 — PROTECT DRAIN INLETS <br />All storm drain inlets made operable during or potentially influenced by construction shall be protected <br />to prevent unfiltered water from entering the drainage conveyance system. However, the first priority is <br />to keep all access roads clean of sediment and prevent street wash water from entering storm drains <br />until treatment can be provided. The following inlet protection measures will be applied on this project: <br />XG/Watershed <br />20230616 Miller Drainage Report FINAL Page 8 <br />