My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2702 59TH ST SW 2024-07-05
>
Address Records
>
59TH ST SW
>
2702
>
2702 59TH ST SW 2024-07-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2024 1:40:32 PM
Creation date
6/24/2024 10:04:32 AM
Metadata
Fields
Template:
Address Document
Street Name
59TH ST SW
Street Number
2702
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Evaluation <br />Miller Property Slope Stabilization <br />Everett, Washington <br />SLOPE STABILITY ANALYSES <br />NGA File No. 1333322 <br />July 1, 2022 <br />Page 9 <br />The failed site slopes were analyzed for stability along Cross -Section C-C' (Figure 5) through the planned <br />repair area using the computer program Slope/W, by Geo-Slope International. Slope/W is a two-dimensional, <br />limit equilibrium slope stability program that generates random potential failure surfaces or specific failure <br />surfaces and determines their corresponding factors of safety with respect to failure. By generating a large <br />number of random surfaces, a critical failure surface with the minimum factor of safety can be identified. <br />The slope stability analyses were performed using information gathered from field and borehole data <br />interpretations from the recent explorations. Soil properties were assigned to the soil layers to reasonably <br />reflect their engineering characteristics based on our experience and behavior under current failure <br />conditions. The following table outlines the material properties for those used in Slope Stability Analyses. <br />Table 2. Material properties interpreted from existing failure conditions. <br />Material Type <br />y (pcf) <br />c' (psf) <br />cp' <br />Landslide Debris/Undocumented Fill <br />138 <br />-- <br />20' <br />Advance Outwash <br />128 <br />-- <br />36' <br />Transitional Beds <br />133 <br />150 <br />35' <br />Structural Fill <br />135 <br />-- <br />38' <br />Stability analyses were performed within the central portion of the landslide area along the cross-section. <br />Stability analyses were performed for non -seismic conditions for the existing conditions, and non -seismic and <br />seismic conditions for proposed stabilization options A and B, respectively. A peak ground acceleration of <br />0.22g was used in the seismic analyses. The results of the analyses are presented in Figures 13 through 17. <br />Our slope numerical modeling of the deep-seated stability condition within the existing slope face indicate <br />that this area is unstable under existing static conditions with factors of safety below 1.0 but would exhibit <br />lower factors of safety under seismic conditions with a factor of safety of less than 0.5. We have also analyzed <br />slope stability with the recommended surficial improvements and pile wall in place within the landslide area <br />using the design parameters discussed in the conclusions section of this report. These analyses reflect the <br />two wall configurations where: Option A results in a retaining wall aligned with the existing southern fence <br />line and Option B results in a retaining wall aligned with the existing landslide headscarp. With the use of the <br />subsurface wall, these analyses indicated stable global slope conditions under both static and seismic loading. <br />These analyses also achieved minimum effective factors of safety of 1.2 for seismic loading conditions. <br />NELSON GEOTECHNICAL ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.