SCOPE OF WORK NOTES ASSUMPTIONS <br /> 1. VERIZON GC TO SUPPLY LABOR AND MATERIALS UNLESS OTHERWISE SPECIFIED.ANY DEVIATION FROM SOW,WILL REQUIRE ADDITIONAL REVIEW BY VZW AND/OR CONSTRUCTION <br /> MANAGER. <br /> 2. IF APPLICABLE, GC TO CALL 811 CALL BEFORE YOU DIG AND HAVE ALL UNDERGROUND UTILITIES LOCATED BEFORE DIGGING. PRIVATE LOCATES MAYBE REQUIRED. <br /> 3. ALL CABLE (NEAR AND FAR END)TERMINATIONS AND ALL ENDS OF MULE TAPE ARE TO BE LABELED FOR DARK FIBER PROJECT USE Actualize <br /> 4. FOOTAGES ARE APPROXIMATE AND MAY DIFFER SLIGHTLY FROM ACTUAL LENGTHS. IF FOOTAGES ARE SEVERELY DIFFERENT THAN SPECIFIED, BRING TO CONSTRUCTION MANAGERS we make (t �0vvm <br /> ATTENTION IMMEDIATELY. <br /> 5. GC IS RESPONSIBLE FOR PROVIDING A CLOSEOUT PACKAGE(COP)TO CONSTRUCTION MANAGER WITHIN 48 HOURS OF COMPLETION, FOR ALL PRE AND POST CONSTRUCTION AN Verizon) <br /> APPROVED COP IS REQUIRED FOR ACCEPTANCE OF WORK AND APPROVAL FOR PAYMENT. <br /> 6. GC IS REQUIRED TO NOTIFY THE CONSTRUCTION MANAGER IMMEDIATELY OF ANY CHANGES REQUIRED TO COMPLETE THE SCOPE OF WORK. NO CHANGES OR MODIFICATIONS TO <br /> THE SOW SHALL COMMENCE WITHOUT APPROVAL FROM THE CM.ANY ADDITIONAL COSTS ASSOCIATED WITH THE APPROVED CHANGES ARE DUE WITHIN 24 HOURS. <br /> 7. ALL GROUND LEADS ARE TO BE#6 AWG INSULATED WIRE.THHN/THWN INSULATED WIRE IS NOT TO BE USED IN ANY CELL SITES.ALL AC/DC AND GROUND WIRE TO MEET VZW AND GLENWOOD <br /> INDUSTRY STANDARDS.VZW GC TO VERIFY WIRE SIZE WITH EQUIPMENT SPECIFICATIONS AND CONSTRUCTION MANAGER PRIOR TO INSTALLATION. 5818 GLENWOOD AVE, <br /> 8. ALL CONDUIT PENETRATIONS REQUIRE A FIRE STOP/WATERTIGHT SEAL TO MAINTAIN NEMA RATING.THE PENETRATIONS ARE TO BE PACKED WITH FIRE PUTTY AFTER INSTALLATION. EVERETT, WA 98203 <br /> 9. WHEN REQUIRED, NEW CABINETS ARE SUPPLIED BY VERIZON AND ARE TO BE PICKED UP BY THE GC AT THE CUSTOMER WAREHOUSE AND INSTALLED AS PART OF THE SOW. <br /> 10. ALL BUILDING PENETRATIONS SHALL UTILIZE PLASTIC BUSHINGS, LOCK NUTS,AND FIRE STOP/WATERTIGHT SEAL ONEFIBER-CONVERSION FIBER <br /> 11. WHEN REQUIRED,ANY NEMA BOXES/CABINETS SHALL UTILIZE A MEYERS HUB TO MAINTAIN NEMA RATING. UCR <br /> 12. WHEN REQUIRED NEW DC POWER FROM POWER PLANT TO GMT FUSE PANEL IS TO BE INSTALLED ON TOP OF LADDER RACK. BREAK OFFS ARE TO BE SECURED TO THE LADDER RACK MDG 5000085732 <br /> STRINGER AND NOT RUN BETWEEN THE LADDER RUNGS.TWO LAYERS OF FISH PAPER ARE TO BE USED ON RACK STRINGER AT ALL BREAKOFF POINTS. LOCATION ID: <br /> 13. WHEN REQUIRED,ALL-48VDC DROPS SHALL BE REDUNDANT, UTILIZING TWO BLACK AND RED WIRE FOR+/DESIGNATION.WIRE SIZE TO BE USED IS DESIGNATED IN THE SOW. PROJECT#: 15670063 <br /> 14. ALL CONDUITS WILL UTILIZE PVC SCHEDULE 40 FOR UNDERGROUND, PVC SCHEDULE 80 ABOVE GROUND OR UNDER DRIVEWAYS AND AREAS THAT WILL HAVE VEHICULAR TRAFFIC, FUZE ID: 464516 <br /> UNLESS OTHERWISE SPECIFIED.ANY PVC USED ABOVE GROUND MUST HAVE ALL GLUE STREAKS WIPED OFF AND CLEANED. NO GLUE RUNNING DOWN THE CONDUIT. <br /> 15. ALL TRENCHES ARE TO BE LOCATED WITHIN EXISTING EASEMENT UNLESS PRE-AUTHORIZED. <br /> 16. ALL GROUND SURFACES TO BE RESTORED TO THEIR ORIGINAL CONDITION USING NATIVE MATERIALS. <br /> 17. ALL NEW HAND HOLES WITH TRAFFIC RATED LIDS REQUIRE TRAFFIC RATED BOXES. <br /> 18. GC TO SECURE(N) INNERDUCT TD UNDERSIDE OF CABLE RACK OR SIDE/TOP OF CABLE RACK USING NINE CORD. GC TO PROTECT INNERDUCT AT EVERY SECURING POINT WITH 2 <br /> LAYERS OF FISH PAPER. <br /> 19. ALL BURIED WYE-CASTS MUST BE ENCASED IN CONCRETE. <br /> 20. POC/HH IS TO BE PLACED ON PRIVATE PROPERTY NEAR THE ROW. IF FOR ANY REASON THE POC/HH NEEDS TO SET MORE THAN 12"AWAY FROM THE ROW; INSTALL 4"CONDUIT <br /> WITH INNERDUCT FROM POC/HH TO ROW, CAPPED,AND MARKED FOR FUTURE LOCATION BY FIBER PROVIDER. <br /> 21. ANY DEVIATION FROM THE SOW,WILL REQUIRE ADDITIONAL REVIEW BY REAL ESTATE AND THE CONSTRUCTION MANAGER <br /> 22. ALL WORK IS TO BE REFERRED TO AS MAINTENANCE. <br /> 23. YOU MUST CONTACT THE LANDLORD 48 HOURS PRIOR TO GOING ONSITE. CONTACT INFO WILL BE PROVIDED IN THE NTP. <br /> 24. IN THE EVENT THE FIBER CARRIER HAS INSTALLED THEIR MEET ME POINT PRIOR TO THE GCS ARRIVAL IT IS THE GCS RESPONSIBILITY TO CONNECT TO THE FIBER CARRIERS HH OR <br /> STUB OUT AS APPLICABLE <br /> 25. VZW GC TO SUBMIT MOP 5 DAYS PRIOR AND RECEIVE TECH APPROVAL BEFORE COMMENCEMENT OF SOW. <br /> 26. VZW GC TO DOCUMENT ANY ACTIVITIES DURING SITE VISITS AND/OR INSTALLATIONS OF EQUIPMENT. COP PHOTO OF LOGBOOK REQUIRED. <br /> 27. AN ADDITIONAL FIBER JUMPER SHALL BE PROVIDED FROM THE PROVIDER NID LOCATION TO THE VZW ROUTER.THE LENGTH OF THE ADDITIONAL FIBER JUMPER SHALL BE CALLED OUT <br /> WITHIN THE UCR DOCUMENT. <br /> 28. UCR TO INCLUDE MAKE AND MODEL NUMBER OF EXISTING TELCO CABINET. <br /> 29. ALL POWER LEADS FROM THE PDU TO THE FUSE PANEL MUST BE INSTALLED IN PROTECTIVE FLEXIBLE CONDUIT. IE LIQUID TIGHT. <br /> 30. ALL UNDERGROUND POWER RUNS MUST BE LISTED WITH APPROXIMATE+/-FOOTAGE. <br /> 31. GC WILL NOT BE COORDINATING THE MIGRATION. <br /> 32. GC WILL NOT BE COORDINATING THE MOP. <br /> SHEET No. <br /> SCALE: NTS (11X17) DO NOT SCALE DRAWINGS.CONTRACTOR MUST VERIFY ALL DRAWINGS AND ADVISE CONSULTANTS OF ANY ERRORS OR OMISSIONS. NO VARIATIONS OR MODIFICATIONS TO <br /> WORK SHOWN SHALL BE IMPLEMENTED WITHOUT PRIOR WRITTEN APPROVAL.ALL PREVIOUS ISSUES OF THIS DRAWINGS ARE SUPERSEDED BY THE LATEST REVISION 7 <br />