Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 9/15/2023 9/15/2023 BLDG 12- RAKEEB KHAN APPROVAL eTRAKiT Inspection Request <br /> INSULATION <br /> Notes: <br /> 9/13/2023 9:52 AM WESTROCK CONSTRUCTION LLC <br /> Contact Name:WESTROCK CONSTRUCTION LLC <br /> Site Address:2923 COLBY AVE <br /> Phone:2068508542 <br /> e-Mail:jon@westrockcon.com <br /> Exterior walls of basement <br /> 10/23/2023 10/23/2023 BLDG 08-FRAMING RAKEEB KHAN APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 10/19/2023 8:08 AM WESTROCK CONSTRUCTION LLC <br /> Contact Name:WESTROCK CONSTRUCTION LLC <br /> Site Address:2923 COLBY AVE <br /> Phone:2068508542 <br /> e-Mail:jon@westrockcon.com <br /> Framing at new stairs ok.Ok to cover rock mud and tape stairwell. <br /> 11/6/2023 11/6/2023 BLDG 16-FINAL RAKEEB KHAN CANCELLED eTRAKiT Inspection Request <br /> Notes: <br /> 11/3/2023 10:44 AM WESTROCK CONSTRUCTION LLC <br /> Contact Name:WESTROCK CONSTRUCTION LLC <br /> Site Address:2923 COLBY AVE <br /> Phone:2068508542 <br /> e-Mail:jon@westrockcon.com <br /> Jon called in and cancelled inspection due to plumbing corrections. <br /> 11/9/2023 11/9/2023 BLDG 16-FINAL RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 11/7/2023 3:16 PM WESTROCK CONSTRUCTION LLC <br /> Contact Name:WESTROCK CONSTRUCTION LLC <br /> Site Address:2923 COLBY AVE <br /> Phone:2068508542 <br /> e-Mail:jon@westrockcon.com <br /> Need final plumbing approval for dishwasher and final on electrical low volt permit.Add grab bars to upstairs bathroom. <br /> 11/9/2023 11/9/2023 TEMP CERTIFICATE RAKEEB KHAN APPROVAL 30 day tco <br /> OF OCCUPANCY <br /> Notes: <br /> 30 day tco. <br /> 12/5/2023 12/5/2023 BLDG 16-FINAL RAKEEB KHAN APPRVD-PERMIT <br /> FINAL <br /> Notes: <br /> Contractor is adding vertical bar to either upstairs OR downstairs bathroom. <br /> I <br /> Printed:Thursday,07 December,2023 2 of 3 rk <br /> SUPERION <br />