My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1412 23RD ST 2024-07-05
>
Address Records
>
23RD ST
>
1412
>
1412 23RD ST 2024-07-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2024 1:09:02 PM
Creation date
6/24/2024 11:16:26 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD ST
Street Number
1412
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: PW2304-009 Description: PAVE 400 SQFT FOR PARKING <br /> Applied:4/13/2023 Approved:4/27/2023 Site Address: 1412 23RD ST <br /> Issued:4/27/2023 Finaled: City,State Zip Code: EVERETT,WA 98201 <br /> Status: PERMIT ISSUED Applicant:THOMAS FAHLMAN <br /> Parent Permit: Owner:THOMAS FAHLMAN <br /> Parent Project: Contractor: OWNER <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PERMIT EXTENSION SHARON EXTENSION <br /> 12/28/2023 12/28/2023 (REASON GILFEATHER APPROVED <br /> REQUIRED) <br /> Notes: <br /> NEEDS FINAL <br /> PW 14-ASPHALT PARTIAL <br /> 3/7/2024 3/7/2024 SUBGRADE JIM KNAPPERT APPROVAL <br /> EVALUATION <br /> Notes: <br /> Carport removed,preparing for rock subgrade. <br /> PW 16-CONCRETE <br /> 2:45 CORRECTION <br /> 3/20/2024 F3/20/2024 PM FORMWORK Andy Erickson REQUIRED eTRAKiT Inspection Request <br /> EVALUATION <br /> Notes: <br /> 3/19/2024 6:16 PM Thomas Fahlman <br /> Rebar will be done by 2pm 3/20,concrete scheduled to be poured 3/21 pending approval <br /> Contact Name:Thomas Fahlman <br /> Site Address:1412 23rd St Everett <br /> Phone:2069141153 <br /> e-Mail:thomascfahlman@gmail.com <br /> Asphalt alley restoration required. Broken asphalt in City of Everett alley way must be cleanly cut,demoed and repaved. Run concrete forms along <br /> property line,pour concrete and then replace demoed asphalt with new. Photos attached. <br /> PW 16-CONCRETE <br /> 3/21/2024 E3/21/2024 FORMWORK JIM KNAPPERT APPROVAL eTRAKiT Inspection Request <br /> EVALUATION <br /> Notes: <br /> 3/20/2024 8:12 PM Thomas Fahlman <br /> Rebar and forming has been confirmed as being placed.Concrete is scheduled to be poured at 3pm pending approval,looking to pour before the <br /> weather gets bad Friday. <br /> Contact Name:Thomas Fahlman <br /> Site Address:1412 23rd St Everett <br /> Phone:2069141153 <br /> e-Mail:thomascfahlman@gmail.com <br /> I <br /> Printed:Tuesday, 16 April,2024 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.