Laserfiche WebLink
I <br /> 1 ELEMENT#1:PRESERVE VEGETATION/MARK CLEARING LIMITS: <br /> lq BMP C1O1: PRESERVING NATURAL.VEGETATION ' <br /> t <br /> ❑ BMP C102: BUFFER ZONES <br /> n BMP C103: HIGH VISIBILITY PLASTIC OR METAL FENCE ( _ 20, NO STOCKPILES POLE CONSTRUCTION <br /> . AMEND ALL SOILS IN PLACE WITHIN 24 HOURS <br /> ELEMENT#2:ESTABLISH CONSTRUCTION ACCESS: - <br /> ❑ BMP C105: STABILIZED CONSTRUCTION ENTRANCE/EXIT <br /> ❑ BMP C106: WHEEL WASH <br /> • BMP C107: CONSTRUCTION ROAD/PARKING AREA <br /> STABILIZATION <br /> I 31 ELEMENT#3:CONTROL FLOW RATES: <br /> O BMP C203:WATER BARS <br /> ❑ BMP C240:SEDIMENT TRAP I EXISITING GRAVEL 660 SF <br /> ❑ BMP C241:TEMPORARY SEDIMENT POND <br /> I <br /> "ELNOT APPLICABLE TO MY PROJECT t ?�' <br /> i� 120' <br /> I 4JELEMENT#4:INSTALL SEDIMENT CONTROLS: j g ,�-DIRT (e"Ge • <br /> 0 BMP C231: BRUSH BARRIER <br /> ❑ BMP C232: GRAVEL FILTER BERM - ' x <br /> 12 <br /> T3 BMP C233: SILT FENCE <br /> ❑ BMP C234: VEGETATED STRIP _ __. — — FXISTING HOUSE 996 SF <br /> ❑ BMP C235:•WATTLES. • - • 1 10' C Ca < <br /> ❑ BMP C240: SEDIMENTTRAP rs 24 <br /> {. D B <br /> ❑ BMP C241: TEMPORARY SEDIMENT POND I 1 1 <br /> IliQ <br /> 5"ELEMENT tt5:STABILIZE SOILS: l \ 24 C <br /> O BMP C120: TEMPORARY AND PERMANENT t ! I-.z1. _.ien..a <br /> SEEDING I , 120' ' <br /> L� BMP C121: MULCHING PROPOSED 1 ` <br /> O BMP C122: NETS AND BLANKETS • • t L__ EXISITING.CONCRETE <br /> i GARAGE SLAB 468 SF <br /> . ❑ •BMP C123: PLASTIC COVERING <br /> O BMP C124: SODDING ' <br /> ❑ BMPC125: TOPSOILING/COMPOSTING <br /> n BMP C126: POLYACRYLAMIDE FOR SOIL • <br /> EROSION PROTECTION <br /> O BMP C130: SURFACE ROUGHENING <br /> y ❑ BMP C131: GRADIENT TERRACES <br /> ❑ BMP C140: DUST CONTROL �STIELEM ENT#8:STABILIZE CHANNELS AND OUTLETS: <br /> 0 BMP C202: CHANNEL LINING <br /> 16 1ELEMENT#6:PROTECT SOILS: 0 BMP C209: OUTLET PROTECTION <br /> ❑ BMP C120: TEMPORARY AND PERMANENT l'3., NOT APPLICABLE TO MY PROJECT <br /> SEEDING <br /> 10 ELEMENT#10:CONTROL DEWATERING:. <br /> ❑ BMP C130: SURFACE ROUGHENING IltEMENT#9:CONTROL POLLUTANTS: ❑BMP C236: VEGETATED FILTRATION <br /> ❑ 8MP C131: GRADIENT TERRACES BMP C1S1: CONCRETE HANDLING 'SNOT APPLICABLE TO MY PROJECT <br /> Li BMP C200: INTERCEPTOR DIKE AND SWALE `+, BMP C152: SAWCUTTING AND SURFACING •-• <br /> POLLUTION PREVENTION 11 ELEMENT#11:MAINTAIN BMPS: <br /> r� ' <br /> El <br /> BMP C203: WATER BARS 21 BMP C153: MATERIAL DELIVERY,STORAGE AND 14.BMP C150: MATERIALS ON HAND �1"3I ELEMENT#13:PROTECT LOW IMPACT DEVELOPMENT: <br /> ❑ BMP C201: GRASS-LINED CHANNELS <br /> Li BMP C204: PIPE SLOPE DRAINS CONTAINMENT 0 BMP C160: CERTIFIED EROSION AND SEDIMENT 0 BMP C107: BUFFER ZONES <br /> ❑ BMP C205: SUBSURFACE DRAINS O BMP C154: CONCRETE WASHOUT AREA CONTROL LEAD(CESCL NOT REQUIRED 0 BMP C103: HIGH VISIBILITY PLASTIC OR METAL <br /> II BMP C206: LEVEL SPREADER 0 BMP C250: CONSTRUCTION STORMWATER FOR ON-SITE FOR SITES<1 ACRE) FENCE <br /> ❑ BMP C207: CHECK DAMS CIIEMICAL TREATMENT 0 BMP C200: INTERCEPTOR DIKE AND SWALE <br /> ❑ BMP C208: TRIANGULAR SILT DIKE(GEOTEXTILE- 0 BMP 051: CONSTRUCTION STORMWATER 1121 ELEMENT#12:MANAGE THE PROJECT: 0 BMP C207: CHECK DAMS CITY OF E1/ERE <br /> ENCASED CHECK DAM) FILTRATION . -BMP C150: MATERIALS ON HAND 0 BMP C208: TRIANGULAR SILT DIKE(GEOTEXTILE REVIEWED FOR PERMIT <br /> HIGH PH NEUTRALIZATION USING ❑BMP C160: CERTIFIED EROSION AND SEDIMENT ENCASED CHECK DAM <br /> `O NOT APPLICABLE TO THIS EXAMPLE u BMP C252: CO2 CONTROL LEAD(CESCL NOT REQUIRED 0 BMP C231: BRUSH BARRIER ) <br /> 7 ELEMENT#7:PROTECT DRAIN INLETS: 0 BMP C253: PH CONTROL FOR HIGH PH WATER -" FOR ON-SITE FOR SITES<1ACRE) 5LBMP C233: SILT FENCE <br /> ❑ BMP C220:STORM DRAIN INLET PROTECTION 0 NOT APPLICABLE TO MY PROJECT 0 BMP C162: SCHEDULING ❑BMP C234: VEGETATED STRIP • <br /> SHEET 2 OF 2: TESC PLAN <br />