Laserfiche WebLink
Quote No 17397 <br />Project Name American Legion Park Little League <br />PW <br />Plumb Signs, 909 So 28th St, Tacoma WA <br />Thanks for the opportunity to provide a proposal <br />Delivery <br />Address <br />Quote Number 17397American Legion Park Little League PW <br />145 Alverson Blvd <br />Everett <br />WA <br />98201 <br />Project Name American Legion Park Little League PW <br />Created Date 05-20-2024 <br />Contact Lolly Huggins <br />Billing <br />Address <br />City of Everett Parks & Facilities (2330) <br />(01) 802 East Mukilteo Blvd Bdg -Everett, <br />WA <br />Contact Email lhuggins@everettwa.gov <br />Line Quantity Description Unit Price Extended <br />17397 1 1.00 Site Survey $725.76 $725.76 <br />17397 2 2.00 Remove and dispose two (2) freestanding scoreboard signs. Cut supports 6" <br />below grade. Bid for good truck access.$2,488.32 $4,976.64 <br />17397 3 2.00 <br />Scoreboard Installation: Receive, inspect & install two (2) 5' x 14' BA-618 <br />scoreboards. Install at 15-0" overall height complete w/ 6" x 6" beams & <br />footings. Connect to existing power. Run new conduit from old sign to new. <br />Price based on truck access. <br />$12,942.72 $25,885.44 <br />17397 4 1.00 Permit Costs: Permit Procurement: $500.00 Sign Permit $1,500.00 <br /> Electrical Permit $100.00. Engineering $850.00 $2,950.00 $2,950.00 <br />Total $34,537.84 <br />Please note: permits are at cost with a minimum charge of $500.00 for the procurement <br />fee. This is in addition to the quote total. Quote valid for 90 Days or Quote Expiration Date <br />Exclusions: tax, permits, parking permits, engineering, traffic control, credit check fee, and special <br />inspections if required. Time clock not included in price. This is a requirement by the Cities <br /> of Seattle and Tacoma. <br />Assumptions: The quote is also based on easy access to the installation location with <br />120V power provided and a designated circuit being located up front for hook up and secondary <br />wiring accessible.