My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Northwest Playground Equipment/KCDA 6/25/2024
>
Contracts
>
Agreement
>
Other Procurement Agreements
>
Northwest Playground Equipment/KCDA 6/25/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2024 1:37:00 PM
Creation date
6/25/2024 1:36:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Northwest Playground Equipment/KCDA
Approval Date
6/25/2024
Council Approval Date
6/5/2024
End Date
3/31/2026
Department
Procurement
Department Project Manager
Jenny Chang
Subject / Project Title
Kiwanis Park Renovations
Tracking Number
0004397
Total Compensation
$106,269.91
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Agreement between Client, KCDA and Contractor - Washington Page 1 <br />156691459.1 <br />AGREEMENT <br />BETWEEN <br />CITY OF EVERETT (“CLIENT”), <br />KING COUNTY DIRECTORS’ ASSOCIATION (“KCDA”), <br />AND <br />NORTHWEST PLAYGROUND EQUIPMENT, INC., (“CONTRACTOR”) <br /> <br />This AGREEMENT is made as of the 24th day of June, 2024, between the public entity City of Everett <br />(“Client”) 2930 Wetmore Avenue, Everett, WA 98201 (address); King County Directors Association (KCDA), <br />Street Address: 18639 - 80th Ave S, Kent, WA 98032; and the Contractor: Northwest Playground Equipment, <br />Inc. <br />This Agreement supplements the King County Directors’ Association (“KCDA”) Purchase Order <br />Number 4144120 (“Purchase Order”) for the Client. <br /> <br />A general description of the Project is: <br /> Renovation and restriping the sport court, including installation of a new adjustable height basketball <br />hoop and installing a new SUTU soccer practice back board. <br />The Architect/Engineer (“A/E”), if any, is: <br /> <br /> <br /> <br /> The Client, KCDA, and Contractor agree as set forth below. <br /> <br /> <br />ARTICLE 1 <br />THE WORK <br /> <br /> 1.1 This Agreement provides supplemental terms and conditions to the Purchase Order and is <br />incorporated by reference into the Purchase Order as if set forth in full therein. This Agreement shall be <br />completed and executed for all KCDA projects that include any on-site construction activities. The Contractor <br />shall fully execute and complete the entire Work described in the Contract Documents. <br /> <br />ARTICLE 2 <br />DATES OF COMMENCEMENT AND SUBSTANTIAL AND FINAL COMPLETION <br /> <br /> 2.1 The date of commencement of the Work (the date from which the Contract Time is measured) <br />shall be the date established in a notice to proceed issued by the Client, unless a different date is stated below: <br /> <br /> 2.2 The Contractor shall achieve Substantial Completion of the entire Work no later than 12/31/2025 <br />and Final Completion no later than 3/31/2026, subject to adjustments of the Contract Time as provided in the <br />Contract Documents. <br /> <br /> 2.3 Liquidated damages, if any, shall be $0.00 per day for each calendar day after the Contract Time <br />that Substantial Completion is not attained, and shall be paid to the Client. <br />
The URL can be used to link to this page
Your browser does not support the video tag.