My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington Military Department 6/17/2024
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
Washington Military Department 6/17/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2024 1:55:11 PM
Creation date
6/25/2024 1:50:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington Military Department
Approval Date
6/17/2024
Department
Information Technology
Department Project Manager
Rick Bailey
Subject / Project Title
Advanced Network Monitoring for IT & OT Networks; and Next Generation Firewalls for OT Networks
Tracking Number
0004400
Total Compensation
$140,000.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Article L - Indirect Cost Rate <br />2 C.F.R. section 200.211(b)(15) requires the terms of the award to include the indirect cost rate for the federal award. If <br />applicable, the indirect cost rate for this award is stated in the budget documents or other materials approved by FEMA and <br />included in the award file. <br />Article LI - Funding Hold: Additional Information Required <br />FEMA has placed a funding hold on this award, and $5,067,919 is on hold in the FEMA financial systems. The recipient is <br />prohibited from obligating, expending, or drawing down the funds associated with the following projects/investments. <br />All projects to be determined: $5,067,919 <br />To release the funding hold, the recipient must provide a detailed cost breakdown and justification for the projects/ <br />investments listed above. FEMA will rescind the funding hold upon its review and approval of the detailed cost breakdown and <br />justification. If you believe this funding hold was placed in error, please contact the relevant Preparedness Officer at fema- <br />slcgp©fema.dhs.gov. <br />BUDGET COST CATEGORIES <br />Personnel $286, 647.00 <br />Fringe Benefits $108,926.00 <br />Travel $8,625.00 <br />Equipment $0.00 <br />Supplies $3,125.00 <br />Contractual $8, 791, 661.00 <br />Construction $0.00 <br />Indirect Charges $55,395.00 <br />Other $0.00 <br />DHS-FEMA-SLCGP-FY23 <br />Page 33 of 39 Everett, E24-268 <br />
The URL can be used to link to this page
Your browser does not support the video tag.