My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3200 HEWITT AVE 2024-07-03
>
Address Records
>
HEWITT AVE
>
3200
>
3200 HEWITT AVE 2024-07-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 10:30:02 AM
Creation date
6/26/2024 10:47:38 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
3200
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CONSIGNMENT MOCKUP <br /> T FASTS/GNS <br /> SIGNAGE 1 Mockup SIGNAGE 2 E V E R E T T <br /> vanes wci.p Is..pum..r.e.fe0 d..• ftbW..r A m <br /> tu.pr.w.r...e.er e..s omer.o.....v wn r..prw v�n poresq wn«av <br /> ORDER <br /> CLIENT: EVERETT <br /> CONSIGNMENT <br /> PROJECT: Illluminated <br /> Wall Signs <br /> I _ <br /> VERSION: 1 <br /> 16— DATE 10/30/2023 <br /> 6an�elIT NAGER: <br /> DESIGNER: <br /> Duane Steig <br /> rSUBMITTAL REVISIONS <br /> BY <br /> DATE <br /> I <br /> AS SHOWN <br /> WITH REVISIONS AS NOTED <br /> Channel Lettering i 0 �y <br /> Wall Detail <br /> 5" Deep Aluminum Channel Letters with ' <br /> Internally Illuminated LEDs <br /> Letter Height 45" ' O <br /> *Rendering not to scale unless otherwise noted. <br /> At FASTSIGNS,we take pride in precision,but the final examination for accuracy is your responsibility.Before giving approval,please examine all proofs carefully for the accuracy of information presented,as well as spelling,punctuation, <br /> numbers,graphics,colors,room numbers,install locations and general layout.In the event that we have miscommunicated regarding your original design,we will be happy to provide a second proof free of charge if needed.If further Page 3 of 6 <br /> revisions are required after approval has been received,additional charges will be incurred.Our normal production cycle will begin from the date approval is received.We cannot accept changes or approvals verbally. <br />
The URL can be used to link to this page
Your browser does not support the video tag.