Laserfiche WebLink
EVERETT CONSIGNMENTSIGN CONSTRUCTION/ATTACHM <br /> FASTS/GNS <br /> F1 qpr9w 196 . 79 11 E V E R E T T <br /> l <br /> ORDER #83466 <br /> CLIENT: EVE RETT <br /> CONSIGNMENT <br /> Ln <br /> PROJECT: Illluminated <br /> Wall Signs <br /> SIGNAGE 1: HEWITT Ave Side of the Building 61 .5 Sq Ft VERSION: 1 <br /> 319 . 44" <br /> - - DATE • <br /> 23 <br /> i <br /> I I — eROJEci MANAGER: <br /> Daniel Albert <br /> L <br /> DESIGNER: <br /> Duane Steig <br /> SIGNAGE 2: CHESTNUT Street Side of the Building 99.8 Sq Ft REVISIONSSUBMITTAL <br /> STAINLESS STEEL 113"x C <br /> anchor bohs.lags and shields <br /> FRONT VIEW approx.32"on center. <br /> Fabricated Aluminum Raceway Typical <br /> painted to match building facade <br /> Brick Facade with <br /> S aluminum 5" 1"Decorative Brick protrusion <br /> return r <br /> OnG Pretorrted awn.channel!etiers <br /> White Acrylic face <br /> w,l3M Vinyl oterizy painted black, aa:ntc4 inside why <br /> Sealtite APPROVAL <br /> Clinched and 1'Black 3eW to Tnrncap conduit to <br /> cau4 eb seam MWtion box B Y <br /> Electrical primary thru]rT aia. <br /> Sealtiteconnector conduit seal all v.41 penetrations DATE <br /> with construction qrade s'icorie <br /> caulk AS SHOWN <br /> RGB-',1!rie LED _ o I <br /> O WITH REVISIONS AS NOTED <br /> ilwtir or PrM+While LED ihrr raton <br /> 1'trim cap <br /> Drain hole Black <br /> ,t don box wah pmlary <br /> dKkK:al. <br /> Petumpainted TTodededcated 110 AMPor <br /> O <br /> 89ac1t � •I <br /> At FASTSIGNS,we take pride in precision,but the final examination for accuracy is your responsibility.Before giving approval, please examine all proofs carefully for the accuracy of information presented,as well as spelling, punctuation, <br /> numbers,graphics,colors,room numbers,install locations and general layout. In the event that we have miscommunicated regarding your original design,we will be happy to provide a second proof free of charge if needed. If further Page 5 of 6 <br /> revisions are required after approval has been received,additional charges will be incurred.Our normal production cycle will begin from the date approval is received.We cannot accept changes or approvals verbally. <br />