My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4030 RUCKER AVE 2024-10-25
>
Address Records
>
RUCKER AVE
>
4030
>
4030 RUCKER AVE 2024-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2024 11:44:03 AM
Creation date
6/28/2024 9:17:51 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
4030
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: S2206-005 Description: INSTALL NEW ILLUMINATED AM/PM SIGN-REMOVE <br /> EXISTING AM/PM S <br /> Applied:6/6/2022 Approved: 6/30/2023 Site Address:4030 RUCKER AVE <br /> Issued:7/3/2023 Finaled: 1/4/2024 City,State Zip Code: EVERETT,WA 98201 <br /> Status: FINALED Applicant: PROJECT CSI LLC <br /> Parent Permit: Owner:TRINITY PETRO LLC <br /> Parent Project: Contractor: PROJECT CSI LLC <br /> Details: <br /> INSTALLING WOODGRAIN ACM(FRONT&RIGHT ELEVATION,INSTALL NEW AM/PM WALL SIGN ON FRONT ELEVATION AND RIGHT <br /> ELEVATOIN,PAINT EXISTING BUILDING. <br /> INSTALL NEW ILLUMINATED AM/PM SIGN-REMOVE EXISTING AM/PM S <br /> 11111111 <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> SIGN 04- CORRECTION <br /> 11/16/2023 11/16/2023 FINAL/PERMIT RAKEEB KHAN REQUIRED eTRAKiT Inspection Request <br /> CLOSE OUT <br /> Notes: <br /> 11/8/2023 8:04 AM Samantha Molden <br /> We have 3 sites for final inspection-please contact Junior T.so he can be on site-209.817.6741 <br /> Contact Name:Samantha Molden <br /> Site Address:4030 RUCKER AVE <br /> Phone:2194482858 <br /> e-Mail:Samantha@projectcsi.com <br /> Foundation was not inspected by CoE building inspector.Unable to visually verify foundation.Need engineer letter of approval for foundation work or <br /> demo foundation and schedule foundation inspection. <br /> 12/27/2023 PM 12/27/2023 PM PLANNING JESSICA JARVI APPROVAL <br /> LANDSCAPING <br /> Notes: <br /> SIGN 04- APPRVD-PERMIT <br /> 1/4/2024 1/4/2024 FINAL/PERMIT RAKEEB KHAN FINAL As noted <br /> CLOSE OUT** <br /> Notes: <br /> City of Everett building inspector did not inspect the foundation.See engineer letter regarding foundation approval. <br /> I <br /> Printed: Friday,05 January,2024 1 of 1 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.