Laserfiche WebLink
<br />Economy Fence Center <br /> ECONOFC912DU <br /> <br />11709 Cyrus Way <br />Mukiteo, WA 98275 <br />Mukilteo: (425) 347-1355 <br />Fax: (425) 347-1357 <br />Direct/Mobile: (425) 387-7033 <br /> <br /> Brent@EconomyFence.com <br />A division of <br />FenceSystems NW <br /> <br /> <br /> <br /> <br /> <br />Thank you for the opportunity to bid this project! <br /> <br /> <br /> <br />Brent McBride <br />Commercial Sales – Project Manager <br /> <br />SUBCONTRACT PROPOSAL <br />5/21/2024 <br /> <br />Project: Loganberry Lane Trails Fencing (Certified Prevailing Wages & Forms included) <br /> <br /> <br />Scope of Work: • Economy Fence Center proposes to furnish all labor, materials, tools, transportation, <br />equipment and supervision necessary for the installation of the following: <br /> <br />• Chain Link – Tear out and haul away approx. 45 LF of existing chain link and install <br />approx. 300 LF of all galv. 2” x 9ga x 4ft tall chain link with two self-closing walk gates = <br />$18,493.00 <br /> <br />Exclusions: Clearing, grading or grubbing of fence lines Grounding of fence & gates <br /> PT slab x-rays, water lines, erosion control Permits, Surveys, Traffic control <br /> Panic Bars, Liquidated Damages Engineering, mow strips <br /> Core drilling, saw cutting of concrete/asphalt Privacy Slats, privacy slats <br /> Private utility locating, pollution Insurance <br />Trenching, landscaping <br />Removal of existing brush <br />Removal of spoils from site <br /> <br /> <br /> <br />Notes: Sales tax is not included. <br /> Please allow 3 weeks for receipt of material and start of installation. <br /> Working days needed on site are approximately 4. <br /> Access to fence lines is needed for distributing of materials, digging equipment and trucks. <br />Prices are good for 30 days. <br /> <br /> <br /> <br />Accepted by: _____________________ Title: ____________________ Date: ________________