My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington Military Department 6/3/2024 (2)
>
Contracts
>
6 Years Then Destroy
>
2025
>
Washington Military Department 6/3/2024 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 2:52:28 PM
Creation date
7/1/2024 2:51:29 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington Military Department
Approval Date
6/3/2024
End Date
1/31/2025
Department
Information Technology
Department Project Manager
Rick Bailey
Subject / Project Title
E24-156: Cyber Supply Chain Risk Assessment – 2022 SLCGP
Tracking Number
0004411
Total Compensation
$50,000.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
DHS-FEMA-SLCGP-FY22 Page 7 of 36 City of Everett, E24-156 <br />5. ENVIRONMENTAL AND HISTORICAL PRESERVATION <br />a. The Subrecipient shall ensure full compliance with the DHS/FEMA Environmental Planning and <br />Historic Preservation (EHP) Program. EHP program information can be found at <br />https://www.fema.gov/grants/guidance-tools/environmental-historic all of which are incorporated <br />in and made a part of this Agreement. <br />b. Projects that have historical impacts or the potential to impact the environment, including, but <br />not limited to, construction of communication towers; modification or renovation of existing <br />buildings, structures, and facilities; or new construction, including replacement of facilities, must <br />participate in the DHS/FEMA EHP review process prior to project initiation. Modification of existing <br />buildings, including minimally invasive improvements such as attaching monitors to interior walls, <br />and training or exercises occurring outside in areas not considered previously disturbed also <br />require a DHS/FEMA EHP review before project initiation. <br />c. The EHP review process involves the submission of a detailed project description that includes <br />the entire scope of work, including any alternatives that may be under consideration, along with <br />supporting documentation so FEMA may determine whether the proposed project has the <br />potential to impact environmental resources and/or historic properties. <br />d. The Subrecipient agrees that, to receive any federal preparedness funding, all EHP compliance <br />requirements outlined in applicable guidance must be met. The EHP review process must be <br />completed and FEMA approval must be received by the Subrecipient before any work is <br />started for which reimbursement will be later requested. Expenditures for projects started before <br />completion of the EHP review process and receipt of approval by the Subrecipient may not be <br />reimbursed. <br />6. PROCUREMENT <br />The Subrecipient shall comply with all procurement requirements of 2 CFR 200.317 through 200.327 <br />and as specified in the General Terms and Conditions (Attachment B, A.10). <br />a. For all contracts expected to exceed the simplified acquisition threshold, per 2CFR200.1, the <br />Subrecipient must notify the Department. The Department may request pre-procurement <br />documents, such as request for proposals, invitations for bids and independent cost estimates. <br />This requirement must be passed on to any non-federal entity to which the Subrecipient makes a <br />subaward, at which point the Subrecipient will be responsible for reviewing and approving sole <br />source justifications to any non-federal entity to which Subrecipient makes any award. <br />b. For all sole source contracts expected to exceed the micro-purchase threshold per 2 CFR 200.1, <br />the Subrecipient must submit justification to the Department for review and approval. This <br />requirement must be passed on to any non-federal entity to which the Subrecipient makes a <br />subaward, at which point the Subrecipient will be responsible for reviewing and approving sole <br />source justifications to any non-federal entity to which Subrecipient makes any award.. <br />7. SUBRECIPIENT MONITORING <br />a. The Department will monitor the activities of the Subrecipient from award to closeout. The goal of <br />the Departments monitoring activities will be to ensure that subrecipients receiving federal pass- <br />through funds are in compliance with this Agreement, federal and state audit requirements, <br />federal grant guidance, and applicable federal and state financial regulations, as well as 2 CFR <br />Part 200 Subpart F. <br />b. To document compliance with 2 CFR Part 200 Subpart F requirements, the Subrecipient shall <br />complete and return to the Department an Audit Certification/FFATA form. Reporting <br />requirements are referenced in section 3.c. <br />c. Monitoring activities may include, but are not limited to: <br />i. Review of financial and performance reports; <br />ii. Monitoring and documenting the completion of Agreement deliverables; <br />iii. Documentation of phone calls, meetings (e.g., agendas, sign-in sheets, meeting minutes), e- <br />mails, and correspondence;
The URL can be used to link to this page
Your browser does not support the video tag.