My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. 7/1/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Kimley-Horn and Associates, Inc. 7/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 2:56:17 PM
Creation date
7/1/2024 2:55:26 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kimley-Horn and Associates, Inc.
Approval Date
7/1/2024
Council Approval Date
6/26/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Corey N. Hert
Subject / Project Title
Safe Streets and Roads for All Safety Action Plan
Tracking Number
0004412
Total Compensation
$985,451.97
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EXHIBIT A – SCOPE OF WORK <br />1 <br /> <br />City of Everett, WA <br />SAFETY ACTION PLAN <br />SCOPE OF WORK <br />June 10, 2024 <br /> <br />Prepared by: <br />Kimley-Horn and Associates, Inc. <br />Contact: Brent Crowther <br />Brent.crowther@kimley-horn.com <br />Direct: 385-420-0941 <br />Mobile: 520-429-6868 <br /> <br />BACKGROUND <br />City of Everett (CITY) is seeking to develop a Safe Streets and Roads for All: City of Everett <br />Safety Action Plan (SAP). The purpose of the SAP is to develop a holistic, well-defined strategy <br />to reduce roadway fatalities and serious injuries in the City of Everett. The SAP will analyze <br />safety needs, identify high-risk locations and factors contributing to crashes, and prioritize <br />strategies to address them. The SAP will be structured to identify and prioritize safety needs <br />within the City of Everett. <br />The SAP will support future applications for Implementation Grants from the United States <br />Department of Transportation (USDOT) Safe Streets and Roads for All (SS4A) program. Grant <br />applications are not included as part of this scope of work. <br /> <br />PLANNING STRUCTURE <br />The SAP will be prepared in collaboration with the following: <br />● Project Management Team (PMT): comprised of the CITY Project Manager, Kimley-Horn <br />Project Manager, Kimley-Horn Project Director, anticipated to meet bi-weekly. <br />● Extended Project Team: City Project Manager, Kimley-Horn Project Manager, Kimley- <br />Horn Project Director, DKS Project Manager, PRR Project Manager. <br />● Steering Team: five to eight individuals, comprised of representatives from City staff, <br />Transportation Advisory Committee, and law enforcement, emergency medical services, <br />and administration, anticipated to meet monthly to report study progress, and present <br />analysis approach, issues, and solutions. The Steering Team will lead and be responsible <br />for SAP Implementation upon study conclusion. <br />● Stakeholders: City of Everett engineering and planning representatives, WSDOT, <br />stakeholders representing 4-Es of Safety: engineering, enforcement, emergency <br />services, and education. Stakeholders will convene four times during SAP development: <br />Workshop #1 (Safety Launch), Workshop #2 (Safety Analysis), Workshop #3 (Strategy <br />and Project Type Recommendations), and Workshop #4 (Draft SAP Report). <br />
The URL can be used to link to this page
Your browser does not support the video tag.